PRESENTATION SUMMARY. Introduction Overview ( M. Ryan ) Geography Living with the Red ( M. Clamen ) Conclusions and Recommendations Accomplishment's Improvements in Flood Forecasting ( Dan Luna ) Mitigation (Structural/non-structural/Policy/Legislation changes) North of the Border

terra
Download Presentation

PRESENTATION SUMMARY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTATION SUMMARY • Introduction • Overview (M. Ryan) • Geography • Living with the Red (M. Clamen) • Conclusions and Recommendations • Accomplishment's • Improvements in Flood Forecasting (Dan Luna) • Mitigation (Structural/non-structural/Policy/Legislation changes) • North of the Border • Manitoba (D. McNeil) • South of the Border • US Federal (J. DeHarnais) • US State (D. Frink) • Summary • What’s next? (M. Ryan) • Questions Accomplishments – Improvements

  2. Red River Flood of the Century10 years later 4th International Symposium on Flood DefenceMay 6, 2008 Dan Luna, NOAA/NWS Accomplishments – Improvements

  3. Recommendations from the IJC Report after the ’97 Flood • Implement Advance Hydrologic Prediction Services (AHPS). • Improve hydrometeorologic data networks. • Improve communications among forecasters with the public. • Data supporting the operation of the hydraulic models and model outputs should be made widely available. Accomplishments – Improvements

  4. Specifically Implemented AHPS and new modeling. • 1999 – FLDWAV implemented. • 2002 – MIKE-11 implemented as a planning and potential forecasting tool along with a gis-based user tool. Accomplishments – Improvements

  5. PTH #4 bridge Selkirk Winnipeg MIKE-11 model Water levels calculated at 935 points. Morris Manitoba Flow calculated at 525 points North Dakota Grand Forks Accomplishments – Improvements

  6. Specifically Implemented AHPS and new modeling. • 1999 – FLDWAV implemented. • 2002 – MIKE-11 implemented as a planning and potential forecasting tool along with a gis-based user tool. • 2005 - Existing FLDWAV model was updated by adding 161 cross-sections. Total – 554. Accomplishments – Improvements

  7. Background LIDAR • Dark blue - Red River • Light blue - secondary channel • Green – cross-sections • Yellow with Red outline – City of Fargo Accomplishments – Improvements

  8. Specifically Implemented AHPS and new modeling. • 1999 – FLDWAV implemented. • 2002 – MIKE-11 implemented as a planning and potential forecasting tool along gis-based tools. • 2005 - Existing FLDWAV model was updated by adding 161 cross-sections. Total – 554. • 2006 Lumped model was re-calibrated. Accomplishments – Improvements

  9. What Did We Do? • Implemented AHPS and new modeling. Improved hydrometeorologic data networks. Accomplishments – Improvements

  10. Stations that report daily Accomplishments – Improvements

  11. LEGEND Accomplishments – Improvements

  12. What Did We Do? • Implemented AHPS and new modeling. • Improved hydrometeorologic data networks. • Drastically improved communications among forecasters with the public and emergency management and improved Municipal, Provincial and Local Response. Accomplishments – Improvements

  13. Communication, Coordination, and Collaboration are a must • Flows are sent to Manitoba as well as our other Federal water partners. • Coordination takes place continually during significant floods. • Collaboration takes place during high impact events (New for 2006). Accomplishments – Improvements

  14. Successes in Spring 2006 • Started communicating our concerns as early as 1/9/06 and followed that up in early February with updated information. Really stressed our concerns. • Continued this approach as time went on and expanded the e-mail list to those appropriate. • Asked the “local flood experts” their opinions in terms of what they thought the possibilities were before forecast issuance. Accomplishments – Improvements

  15. Successes Spring 2006 ‘cont • Conveyed information daily via conference calls and state EOCs. • With IWI involvement we held 2 Press Conferences, before and during flood. • Resulting communication was one clear voice. • Resulting coordination and collaboration was one forecast with credibility. Accomplishments – Improvements

  16. What’s Next? Recommendations • FLDWAV model needs to be expanded. • Cross-sections extended and/or added. • Area included within the model, Sheyenne River upstream to Kindred. • Assumes additional LIDAR data will be available Accomplishments – Improvements

  17. What’s Next? Recommendations • Need to further improve hydrometeorological networks – additional snow water equivalent, frost, and rainfall data essential to better forecasting. • Need to have a better grass roots effort in terms of providing this critical data to the river forecast centres in Minnesota and Winnipeg when we have the potential for significant flooding. Accomplishments – Improvements