National BIM Standard -US NBIMS Project Committee Ballot Presentations August 1-2, 2011. National Institute of Building Sciences – August 1-2, 2011 . Presentation Recordings for Aug 1. 9:05 - 9:15 :05 David Morris / Deke Smith Introduction

jess
Download Presentation

National BIM Standard -US NBIMS Project Committee Ballot Presentations August 1-2, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National BIM Standard -USNBIMS Project CommitteeBallot PresentationsAugust 1-2, 2011 National Institute of Building Sciences – August 1-2, 2011

  2. Presentation Recordings for Aug 1 • 9:05 - 9:15 :05 David Morris / Deke Smith Introduction • 9:15 - 10:00 :45 Mark Butler (V2-001 thru V2-007) • 10:00 - 10:30 :30 Kimon Onuma (V2-023) • 10:30 - 11:15 :45Richard See (V2-028 thru V2-030) • 11:15 -11:30 :30Dominique Fernandez OverviewCommenting • 12:30 -1:00 :30Phillip Cousins (V2-034) • 1:00 -1:30 :30Roger Grant (V2-043) • 1:30 - 2:00 :30James Vandezande (V2-011 and V2-025) • 2:00 -2:30 :30Greg Ceton (V2-035 thru V2-040) • 2:30 -3:00 :30Chris Moor (V2-017) • 3:00 -3:45 :45Bill East (V2-019) Click on hyperlink for associated authors video presentation

  3. Presentation Recordings for Aug 2 • 9:159:45 :30John Messner(V2-021and V2-022) • 9:4510:00 :15Greg Schleusner (V2-012) • 10:0010:15 :15Tammy McCuen (V2-008r1, V2-009) • 10:1511:00 :45Dianne Davis (V2-013 and V2-020) • 11:0011:30 :30 David Morris (V2-044) • 11:3011:45 :15Kristine Fallon(V2-016) Note: You may also access these videos on the portal under Presentations in the NBIMS-Project Committee. The files have not yet been post processed to clip out un-necessary pre-presentation discussions. This will be done, but I wanted to get the presentations posted as soon as possible. Click on hyperlink for associated authors video presentation

  4. NBIMS-US Ballot Overview (Slides 6-12) Please click on square above to start video.

  5. NBIMS-US Ballot Overview (Slides 13-22) Please click on item above to start video.

  6. AGENDA • Ballot Review Period • Technical Subcommittee and Workgroups Ballot Reviews & Recommendations • Ballot Review Results • Ballot Comment Period • Accessing & Viewing Submitted Ballots • Reviewing Submitted Ballots • Commenting on Submitted Ballots in Comment Tracker • Future Milestones • Ballot Comment Review and Summary Period • Ballot Comment and Discussion Meeting • Ballot Preparation Period • Ballot Voting Period National Institute of Building Sciences - August 1_, 2011

  7. Ballot Review Period National Institute of Building Sciences – August 1-2, 2011

  8. Technical Subcommittee & Workgroups Reviews & Recommendations • Received 44 Submissions* • 35 - Ballot Submissions • 9 - Blue Sky submissions *One ballot was removed –duplicate submission • Two levels of Reviews • 1st Level of Review - Technical Subcommittee (makes recommendations to workgroups) • 23 Ballots Reviewed by Technical Subcommittee for conformance to: • Information Exchange Standard Submission Requirements • Reference Standard Submission Requirements • Practice Standard Submission Requirements • 2nd Level of Review – Workgroups (make recommendation to Project Committee) • 25 Ballots Reviewed by WG-1 Design Workgroup • 0 Ballots Reviewed by WG-2 Procure Workgroup • 4 Ballots Reviewed by WG-3 Assemble Workgroup • 6 Ballots Reviewed by WG-4 Operate Workgroup National Institute of Building Sciences - August 1_, 2011

  9. Technical Subcommittee & Workgroups Reviews & Recommendations • 35 Ballot Submissions Categorized by Type • 10 - Commentary – Update of V1P1 Chapters • 6 - Information Exchange Standards • V2-017 IDM – Steel • V2-019 COBie • V2-023 BIM XML • V2-028 IDM/MVD Design to Spatial Program Validation • V2-029 IDM/MVD Design to building Energy Analysis • V2-030 IDM/MVD Design to Quantity Take off • 4 Practice Standards • V2-016 Planning, Executing and Managing Information Handovers • V2-021 BIM Project Execution Planning Guide • V2-022 BIM Project Execution Plan Content • V2-021 MEP Coordination Requirements for BIM National Institute of Building Sciences - August 1_, 2011

  10. Technical Subcommittee & Workgroups Reviews & Recommendations • 35 Ballot Submissions Categorized by Type –cont. • 11 - Reference Standards • V2-012 IFC 2x3 • V2-013 W3C XML Specification and Validation • V2-018 Stakeholder Provisioned Internet Accessible Information • V2-025 National CAD Standard • V2-032 OGC Discussion Papers • V2-035 OmniClass Table 13 • V2-036 OmniClass Table 21 • V2-037 OmniClass Table 22 • V2-038 OmniClass Table 23 • V2-039 OmniClass Table 32 • V2-040 OmniClass Table 36 • 4 - Terminology Standards • V2-011 BIM Use Definitions • V2-014 BIM File Naming • V2-020 Level of Development • V2-043 V1P1 – Appendix C IFD Library National Institute of Building Sciences - August 1_, 2011

  11. Ballot Review Results • Approved– No changes necessary. The ballot item will be forwarded to the NBIMS PC as-is • Approved as Noted – Minor changes have been agreed upon by the Workgroup and the author. The ballot item will be forwarded to the NBIMS PC with approved revisions incorporated in the ballot Item Submittal. Minor changes will be documented by the Workgroup on the portal and in the Workgroup Review Sheet of the Ballot Submittal Form. • Revise/Resubmit -  Errors or omissions are substantial. The author needs to revise the ballot item and resubmit it. A list of errors or omissions, with recommended changes, will be provided to the author by the Workgroup. • Rejected– The ballot item is not in the best interest of the NBIMS. Rejected ballot items can be resubmitted by petition to the NBIMS Planning Committee for consideration. National Institute of Building Sciences - August 1_, 2011

  12. Ballot Review Results • Workgroup Recommendations: • 23 Submission are “Approved” or “Approved as Noted” • 3 Submissions have been merged into one and “Approved as Noted” • 5 Submissions are “Revise/Resubmit” with the recommendation to either resubmit for V3 cycle (2012) or resubmit as a “Blue Sky” • 2 Submissions have been withdrawn by the authors of the submissions and resubmitted as “Blue Sky” • 1 Submission has been “Withdrawn” by its author • 1 Submission is “Rejected” National Institute of Building Sciences - August 1_, 2011

  13. Ballot Comment Period National Institute of Building Sciences – August 1-2, 2011

  14. Accessing and ViewingSubmitted Ballots Portal Home Page National Institute of Building Sciences – August 1-2, 2011 - August 1_,

  15. Accessing and ViewingSubmitted Ballots Submitted Ballots Table National Institute of Building Sciences - August 1_, 2011

  16. Reviewing Submitted Ballots View Ballot – click on title National Institute of Building Sciences - August 1_, 2011

  17. Reviewing Submitted Ballots Review Comments – click on reply to comment National Institute of Building Sciences - August 1_, 2011

  18. Reviewing Submitted Ballots Review Comments View Ballot National Institute of Building Sciences - August 1_, 2011

  19. Comment on Submitted Ballots Submit Comment National Institute of Building Sciences - August 1_, 2011

  20. CollaborationPortal -Access Member Portal Login at: www.buildingsmartalliance.org/index.php/nbims/ National Institute of Building Sciences

  21. Future Milestones • Ballot Comment Review and Summary Period – Sept. 2-18 • Ballot Comment and Discussion Meeting – Sept. 19-20 • Ballot Preparation Period – Sept. 21-27 • Ballot Voting Period – Sept. 28 – Oct. 27 National Institute of Building Sciences - August 1_, 2011

  22. Questions?Thank you! National Institute of Building Sciences – August 1-2, 2011