110 likes | 411 Views
Dredging with the Toyo DP150. DP 150 and its power supply mounted on the back of Lima 2400 crane. Maximum pumping distance from barge 75’. Dredging between pile bents in close quarters. Distance view of MBI-05 dredging. Front view of MBI-05 dredging in close quarters.
E N D