An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Commissioning week report Eric, 5-9 may 2014

  2. Moore • Moore v22r1 (Hlt1&2) runs over 2012 L0 deferred data • Various feature changes: • Forking before runnumber change hack • Killing of lumi banks now done in Hlt2 • Dec and selreport writers now give correct sourceIDin output sequence • Tested 3 architectures: • deferred output to /daqarea • deferrred output to /daqarea and left on the /localdisk (necessary for processing by Hlt2) • deferred Hlt2 on Hlt1 output • Forking & checkpointing also tested and works Computing workshop 21 may 2014

  3. Alignment & Calibration • Silvia & Maurizio ran alignment (by hand) over Hlt1 output data • Jibo made new constants independent of data • New constants: • /group/online/alignment • Gerhard is modifying Hlt2 to read these constants • Problem with Rich1 & 2 constants with the same names (but different paths in the db) Computing workshop 21 may 2014

  4. Monitoring • Updated Monitoring programs to run on Hlt1 output data • Released VanDerMeer v6r1 (now uses Online v5r8 to get the correct DAQ/RawEvent.h) Computing workshop 21 may 2014

  5. To be done (before next comm. week) • Hlt1 reads MEPs, HLT2 reads MDF • Event selector options need settings for Hlt1 & 2 • Run Hlt2 deferred and read the new constants • Test Hlt2 “file” monitoring • Some problems finding routingbits & selreports • Automate the production of the new constants • Simone is developing a two-track and di-hadron line for Hlt1 • Preliminary L0 BW decision by next LHCb week • Required to decide how Hlt1 will look • Control system should add entity references to calibration & alignment xml files in • Hlt1_online_xxx.xml (just in case we need this in the future) • Hlt2_online_xxx.xml Computing workshop 21 may 2014