Report on TileCal Commissioning January 25, 2006

Report on TileCal Commissioning January 25, 2006. Team 1: installation, services... Team 2: repairs Team 3: ”routing the last 20 meters of cables”, USA15 connection, finger connections, LVPS insertion, DCS monitoring Team 4: commissioning of superdrawers, take data using MobiDaq. Team 5.

altessa
Download Presentation

Report on TileCal Commissioning January 25, 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report on TileCal Commissioning January 25, 2006

  2. Team 1: installation, services... • Team 2: repairs • Team 3: ”routing the last 20 meters of cables”, USA15 connection, finger connections, LVPS insertion, DCS monitoring • Team 4: commissioning of superdrawers, take data using MobiDaq

  3. Team 5 • Led by Kerstin and Martina Hurwiz • Analyse ALL commissioning data as they come  team 5 shifts (1am1pm Stockholm, 1pm1am Chicago) e.g. 3 runs to check on Tuesday 2 long runs taken during the week end. • In depth analysis of problems, feedback to hardware folks

  4. Commissioning data • Pedestal runs • Charge injection scan • Constant charge injection • LED/laser: light pulse injected into the PMT • Physics/cosmics

  5. Pedestal runs • Pedestal, noise, coherent noise ... Low and high freq. Noise (Kerstin) Coherent noise: look at covarariance matrix for the 48 channels (Ulla)

  6. Single charge injection runs (”MonoCIS”) • Inject a defined and constant charge before the shaper, only done on the low gain (why?) • Find non responding (dead channels) • Check stability over time (long runs over the week end)

  7. This run looks good! Long run (60051) over the week end: problems in module C47 (Kerstin)

  8. Time (a.u.)

  9. Charge injection scan • Inject increasing charges into the shaper • Stuck bits, • Check linearity • Compute gains • Check pulse shapes • Reconstructed pulse height vs phase

  10. Outlook • Increase productivity: efficient ways to look at commissioning runs for team 5 shifters • Define specific analyses and assign to various folks • Make available tools to be able to look at this data in new ways, access all relevant information (eg DCS)