1 / 13

ESA Report on ESA EO missions CEOS Beijing, WGISS Sep. 2004 H. Laur, YL Desnos,

ESA Report on ESA EO missions CEOS Beijing, WGISS Sep. 2004 H. Laur, YL Desnos, I. Petiteville. Topics. ENVISAT DRAGON NRSCC-ESA Joint Programme Earth Explorer Missions 3 rd Party missions: ALOS. ENVISAT. DRAGON Programme. EARTH EXPLORERS. goce. cryosat.

jewel
Download Presentation

ESA Report on ESA EO missions CEOS Beijing, WGISS Sep. 2004 H. Laur, YL Desnos,

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESA Report on ESA EO missions CEOS Beijing, WGISS Sep. 2004 H. Laur, YL Desnos, I. Petiteville

  2. Topics ENVISAT DRAGON NRSCC-ESA Joint Programme Earth Explorer Missions 3rd Party missions: ALOS

  3. ENVISAT

  4. DRAGON Programme

  5. EARTH EXPLORERS goce cryosat smos adm

  6. Earth Explorer Missions Core missions: GOCE:Gravity and Ocean Circulation. ADM-Aeolus: Measuring the winds at all altitudes. Opportunity missions CRYOSAT: Sea-Ice Monitoring Floating sea ice NOAA SMOS: Soil Moisture and Ocean Salinity. Salinity in the Mediterranean

  7. Earth Explorer missions (1/3) • CRYOSAT: • ESA contract, Prime Contractor ACS (I) • Some delays with satellite. Launch planned for 1st quarter of 2005 • Kiruna Ground Station ready • About 60 Scientific projects accepted in Category 1 (data provided by ESA for free)

  8. CRYOSAT Ground Station Kiruna Salmijarvi CRYOSAT equipment

  9. Earth Explorer missions (2/3) • ADM Aeolus: • GS PDS development KO in Jul. 2005, • PDS completed in 2007. • Launch in October 2007. • SMOS: • Ground Segment Phase B on-going until end 2004 then C/D phase

  10. Svalbard Ground Station

  11. Earth Explorer missions (3/3) • GOCE: • ESA contract, Prime Contractor ACS (I) • Ground Segment (PDS) V2 kick-off in Sep. 2003 • Launch in summer 2006

  12. 3rd Party mission: ALOS

  13. ALOS • 3 sensors: 1 SAR L-band and 2 optical • ALOS Data European Node (ADEN): • ESA contract, Prime VEGA (UK). • GS development kicked-off end of July 2002. • Subsystem Factory Acceptance Tests (Sep. 2003 to Jun. 2004) • Launch (summer 2005) • Full deployment by mid 2005

More Related