650 MHz Project

650 MHz Project. Cavities=everything associated with dressed cavities for horizontal test Cavity Tuners Helium vessels Magnetic shielding Couplers, etc. Cryomodules=everything else

jgaitan
Download Presentation

650 MHz Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 650 MHz Project • Cavities=everything associated with dressed cavities for horizontal test • Cavity • Tuners • Helium vessels • Magnetic shielding • Couplers, etc. • Cryomodules=everything else • Define interfaces similarly to plug-compatibility concept of S1-Global cryomodule [but with common components] • Much of this work will be intertwined – requires close communication

  2. 650 MHz Project Assumptions • Cryomodules • Assume b=0.9 cryomodule comes ~first, and b=0.6 CM based on b=0.9 • JLab (MOU final) to produce a document, generic to either beta, with SNS vs. Type-4 CM comparison, specifically focused on optics and reliability (Jan 2011) • India (MOU in progress): • b=0.9 CM design (Q4 2011), prototype, fab • b=0.6 CM design (Q1 2012), prototype, fab • FNAL very preliminary scale-up of Type-4 for 650 MHz, incl. preliminary cryogenic piping sizes, see Tom Peterson’s slides

  3. 650 MHz Project Assumptions • Cavities • FNAL • Draft functional specification exists • Some key inputs not final, e.g., MAWP, HOM or not, coupler port size, required gradient & Q0, df/dP • Ordered six prototype b=0.9 1-cells, will order 2 prototype b=0.9 5-cells • Design:1-cell design drawings complete; 5-cell design engineering drawings in progress • JLab (MOU final) builds/processes/tests two b=0.61 1-cells, due May 2011 and <Sep 2011 • India (MOU in progress) • b=0.9 cavity design (Q4 2011), prototype, fab [Avinash:1-cell proto Q4 2011, 5-cell proto Q4 2012] • b=0.61 cavity design (Q1 2012), prototype, fab • Builds b=0.9 helium vessels, blade tuners, participates in coupler and instrumentation design

  4. 650 MHz FNAL cavity design • LINAC10 (S. Barbanotti et al.) b=0.61 Drawings from Chuck Grimm b=0.9

  5. Plans for next days • Compile list of questions for functional specification • Define as much as we can • Give ranges for as much of the remaining as possible • Leave remainder TBD, hopefully with a plan for how to fill • Improve the schedule, including milestones • Plan for regular, common (cavities, cryomodules) meeting