1 / 9

Closing Report for 802.15 TG10 (L2R) Jan. 2015

Summary of the TG10 (L2R) sessions in Atlanta, including the review process tasks, security discussion, timeline, and next steps.

jhector
Download Presentation

Closing Report for 802.15 TG10 (L2R) Jan. 2015

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report for Jan. 2015 Date Submitted: Jan. 2015 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC Voice: +1 480-586-8457, E-Mail: cpowell@ieee.org Re: TG10 (L2R) Closing Report for January 2015 Abstract: Closing Report for the TG10 (L2R) Sessions in Atlanta Purpose: Layer 2 (Mesh Under) Routing Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

  2. 802.15 TG10 (L2R) Draft a recommended practice for Layer 2 Routing of Dynamically Changing 802.15.4 Mesh Networks.

  3. Meeting Goals/Status • Recap Nov. 802.15 Interim and Current Status • Review Process Tasks to Starting Letter Ballot • Work on Editors Draft • Have Security Discussion with TG9 (KMP) • Review Timeline for Pre-Reviews Prior to March Mtg. • Review Overall TG10 Timeline and Next Steps

  4. Meeting Goals/Status • Recap Nov. 802.15 Interim and Current Status • Review Process Tasks to Starting Letter Ballot • Work on Editors Draft • Have Security Discussion with TG9 (KMP) • Review Timeline for Pre-Reviews Prior to March Mtg. • Review Overall TG10 Timeline and Next Steps

  5. TG Motions Motion to elect a TG10 technical editor. Move to appoint Verotiana Rabarijaona as the TG10 Technical Editor. Moved by: Fumihide Kojima Seconded by: Soo-Young Chang Discussion: None Objections: None Vote: Unanimous

  6. Minutes • Minutes - doc. # 15-15-0066-00

  7. Looking Forward Between Now and Berlin Mtg. in March • Prepare draft for Pre-LB reviews • Hold Pre-LB reviews: 1-TG10, 2-TEG, 3-WG TE • Address comments from 3 Pre-LB reviews • Prepare draft for Letter Ballot • At Berlin Mtg. in March • Finalize Letter Ballot draft at March Mtg. • Seek TG and WG Approvals to start Letter Ballot • Seek TG and WG Approvals of TG10 BRC

  8. Looking Forward (cont’d.) • After Berlin Mtg. in March • Start 1st Letter Ballot • Begin comment resolution after close of ballot Next Juncture w/802.1 • Update at Joint 802.1/802.15 Session in July Mtg.

  9. TG10 Conference Calls Reminder • TG10 Standing Conference Call Info • Day: Mon. • Next Call: 19th, Jan. • Time: 5PM (Pacific) 10AM Tues. (Japan, Korea) • Conf. #: To Be Sent to TG10 Reflector