70 likes | 82 Views
This report summarizes the 802.11 Ad-Hoc Committee's review of the 802.18 PAR and 802.19 Coexistence Assurance, including the protection criteria and LMSC policy changes. The committee conducted reviews, generated responses, and concluded that the concerns were satisfied.
E N D
802.11 AdHoc Committee ReportAl Petrick Al Petrick, IceFyre
802.11 Ad-Hoc Report • Response to the 802.18 PAR • Response to the 802.19 Coexistence Assurance LMSC Policies and Procedure Changes • 5GHz RLAN 802.11a protection criteria document for 802.18 Al Petrick, IceFyre
802.18 Ad-Hoc Review • Reviewed 802.18 proposed WRAN PAR • Generated responses from 802.11 to 802.19 • Doc: 04-0798-00 • Doc: 04-0798-01 • Comments pertained to the scope and distinct identity • Mid-Week Plenary review • Reviewed 802.18 response to 802.11 • Doc: 18-03-0031 • Concluded that the response from 802.18 satisfied the concerns of 802.11 wrt PAR • Conducted a Strawpoll Al Petrick, IceFyre
Strawpoll • The Ad-Hoc committee reviewing the 802.18 SG1 PAR and 5 Criteria is satisfied that, with the additional information made available on Tuesday and Wednesday July 13-14, 2004, the PAR/5 Criteria is adequate. • Results: • Yes: 9 • No:0 • Abstain:1 Al Petrick, IceFyre
802.19 Ad-Hoc Review • Reviewed 802.19 proposed LMSC P&P changes for Coexistence Assurance requirements • Doc:19-04-0010-07 • Requirement for a CA document to be tagged to WG and SG Letter ballots • Made editorial responses for 802.19 to consider • Conducted Strawpoll Al Petrick, IceFyre
Strawpoll • The 802.11 Ad-Hoc coexistence committee reviewing the 802.19 Doc: 19-04-0010-07 believes the document represents the appropriate changes to the LMSC policies and procedures on coexistence. • Results: • Yes: 9 • No: 0 • Abstain:0 Al Petrick, IceFyre
802.11 AdHoc Report • 5GHz RLAN 802.11a protection criteria response to 802.18 • Generated general text covering Market/Applications, Technical Analysis and plots of access point deployment • Turned over text to 802.18 for review and final documentation completion for the September 2004 session. Al Petrick, IceFyre