1 / 1

Defects on TA (2.2%)

Theme:. Name: Company:. Toyota Business Practices (TBP) ■ Problem Solving Flow Chart. The division you belong to: Paint shop in the assembly operations division

jillian-orr
Download Presentation

Defects on TA (2.2%)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Theme: Name: Company: Toyota Business Practices (TBP) ■ Problem Solving Flow Chart The division you belong to: Paint shop in the assembly operations division The background of the job: ▼ New paint floor will be established in June 2006, which will increase the production. Currently the incidence of outflow of paint defects has increased.      ▼ Before establishing the paint floor, we have to decrease the defects without major capital expenditure. Step 1 Clarify the Problem Step 2 Break Down the Problem 【Ultimate Goal】 Having 0 painting defect. 【Process】 By defects categories Units without defects Flow out from Paint shop Units bought off By final paint inspection Units painted & Baked in top coat Units prepared For painting Units primed Contribution Runs & Sags (42%) 【Ideal Situation】 (Should be Situation) 2 % or less of vehicles leave assembly hall with paint related defects that require repair. 【Break Down】 By part Thin paint (34%) Step 3 Target Setting By car Tail gate (57%) 【Prioritized Problem at point of occurrence】 Defects on HILAY (8 %) 【Target】 Paint defects occur Reduce paint defects Dirt (24%) 【Problem】 Door interior left (17%) Paint defects leaving assembly hall need to be reduced by 4 % Defects on TA (2.2%) Door interior right (22%) Step 4 Root Cause Analysis Defects on CORLA (2%) Machine is inappropriate Staff’s performances are poor Painting materials are poor Painting methods are ineffective 【Current Situation】 Currently 6 % of vehicles leave assembly hall requiring paint related repairs Other area (4%) Defects on RUX (2.1%) Difficult tasks to do Skills are poor Staffs do not have capacity to learn There is a no skill development training for staffs 【The points that you cannot fit in the PS steps, The researched data that were not apply for breakdown (Incl. Division Points)】 【Countermeasures】 【Root Cause】 . Conduct a training that can improve staffs’ skill development . Make a poster that reminds staffs not to produce paint defects and put it to a wall Step 5 Develop Countermeasures

More Related