1 / 4

Potential for T1S1 Review of ANSI Point Code Assignments

This document discusses the potential for a review of ANSI Point Code assignments and the need for contributions from US entities to address the issue. The current situation, concerns, and potential work plan are outlined.

jimmyward
Download Presentation

Potential for T1S1 Review of ANSI Point Code Assignments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Potential for T1S1 Review of ANSI Point Code Assignments Fred Gaechter IFAST Chairman +1 732 699 5500 fredgaechter@monmouth.com An SAIC Company

  2. Chronology of Issue at IFAST • Iusacell previously introduced the issue • IFAST supported an ANSI solution • Agreed, in concept, to a US entity offering a contribution to T1S1 • No US entity willing to introduce issue to T1S1 • Recent conference call w/ Carlos Zamora and Telefonica de Espana • My dual role: IFAST Chairman and US SS7 Point Code Administrator • No unilateral solution as Administrator • Agreed to pursue as IFAST Chairman

  3. Discussion with T1S1.3 Chairman • T1S1.3 responsible for oversight of ANSI Point Codes • Current T1S1.3 Chairman (Telcordia) not familiar with the issue • Concerns: • ITU “portability” paranoia • Potential exhaust of finite resource with undetermined demand • Who will be assigned how many resources? • Reality of reclamation? • Friendly, cooperative, non-committal discussion • Strong commitment to address the issue • T1S1.3 is contribution driven • T1S1 member entity contribution • Non-T1S1 member entity contribution

  4. Potential Work Plan • Determine level of IFAST support • If supported, determine what entity will contribute to T1S1.3 • Member entity • Non-member entity • IFAST • Develop contribution and identify presenter(s) • Present contribution and answer questions/concerns • If positive response, assist T1S1.3 in revision of Point Code Assignment Guidelines

More Related