An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2010ESI feedback…eThekwini 08 April 2010

  2. Moses Mabhida Stadium Stadium completed…hosted several events Semi-final between Chiefs & Pirates Capacity of 48,000 at stadium Fed off grid supply – afternoon match Pitch lights were switched on at half time Pitch Lighting Pitch Lighting not evenly spread along catwalk  creates impression that lamps have failed (but not a problem). Supply to Pitch lighting is fed from the essential supply (Generator) UPS debate finalised – City to install – arriving 21 April 2010 2014-10-15 2

  3. eThekwini feedback VOC established at the stadium - no Electricity rep required Disaster Management JOC – still being equipped. Training of facilities to be done at an alternative (already operational) venue. Electricity rep required at briefings only. Normal liaison between ESKOM and eThekwini Control Rooms Regular interaction between 2010 Designated Desk @ eThekwini Electricity and SAC (Situation Awareness Centre) @ ESKOM Load shedding schedules revised UFLS installation complete Maintenance plans on track and continuing 2014-10-15 3

  4. eThekwini feedback All Power Supplies to King Shaka Airport energised. Streetlighting installed. Streetlighting upgrades in vicinity of MM Stadium almost complete Stadium overlay plans being approved. Overlay electricity supply being provided by City. Event Organiser to pay upfront for installation. Fan Park/Mile still under construction Event orgainser appointed Training venues almost complete 2014-10-15 4

  5. Matches at Moses Mabhida Stadium • 13 June Germany vs Australia • 16 June Spain vs Switzerland • 19 June Netherlands vs Japan • 22 June Nigeria vs South Korea • 25 June Portugal vs Brazil • 28 June Second Round Match • 7 July Semi Final 2 2014-10-15 5

  6. Base Camps ALGERIA…Zimbali Lodge…Kwa Dukuza IVORY COAST…Riverside Hotel…eThekwini GREECE…Beverley Hills Hotel….eThekwini CAMEROON…Oyster Box Hotel…eThekwini PARAGUAY…Woodridge Hotel…Eskom 2014-10-15 6

  7. Public Viewing Areas 2 sites nationally during pool game stages 4 sites nationally during quarter final stages All sites for opening and final game Sites in KZN… Midmar dam…11 June, 25 June, 11 July Newcastle Stadium…15 June Qokololo Stadium(Edendale)… 22 June Steadville – Magubane…26 June North End Stadium – Matatiele…02 July, 10 July Marburg Stadium…07 July 2014-10-15 7

  8. ESKOM TX readiness Maintenance plans on track EP (Emergency Preparedness) exercise carried out KZN TX supply transfer limits checked Eskom TX grid suffices the 2010 challenges Thermal limitation on Klaarwater/Umgeni and Durban South line internal to eThekwini High loading at Klaarwater SS  additional transformer installed under way 2014-10-15 8

  9. ESKOM DX readiness Finalisation of PVA and Base Camps will drive final maintenance plan Security Plan has been conceptualised…Need to formalise links and reporting relationships IM (Information Management) plan finalised for the Region Draft for SAC (Situation Awareness Centre) has been completed Load Shedding schedules finalised Risk Matrix completed EP exercise completed 2014-10-15 9