1 / 42

DISCLAIMER

DISCLAIMER.

jiro
Download Presentation

DISCLAIMER

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  2. DISCLAIMER "This presentation is intended to describe ISO-NE's load forecasting process. As this process is conducted on an ongoing basis, depending upon a variety of factors and data which may be updated from time to time, any specific forecast values included in this presentation represent only the current and best estimate by ISO-NE at this time and may be changed in the future. Finally, ISO-NE cautions that this presentation may be misleading if read out of context of explanations provided, statements made, and questions addressed, at the June 19 Technical Conference." 2

  3. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  4. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  5. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  6. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  7. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  8. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  9. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  10. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  11. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  12. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  13. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  14. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  15. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  16. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  17. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  18. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  19. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  20. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  21. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  22. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  23. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  24. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  25. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  26. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  27. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  28. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  29. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  30. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  31. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  32. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  33. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  34. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  35. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  36. Summer Peaks for States & Selected Operating Companies 2003 2008 CAGR% CONNECTICUT: 6900 7253 1.0 ISO: State peaks & Operating Company 2002 Weather Normal CMEEC 328 343 0.9 UI 1367 1460 1.3 CLP 4682 4880 0.8 MAINE: 1970 2114 1.4 BHE 316 308 -0.5 CMP 1833 1804 -0.3 MASSACHUSETTS: 11510 12468 1.6 BECO 3233 3563 2.0 EED 691 729 1.1 FERC715: Operating Company 2003 & 2008 Forecasts MECO 3980 4277 1.4 WMECO+HWP 773 803 0.7 NEW HAMPSHIRE: 2110 2326 2.0 UNITIL 260 306 3.3 GSE 182 202 2.1 PSNH 1472 1508 0.5 RHODE ISLAND: 1730 1851 1.4 BVE 343 354 0.7 NEC 125 137 1.9 NECO 1334 1418 1.2 VERMONT: 975 1020 1.9 VELCO 975 1102 2.5 FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  37. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  38. RTEP03 Peak Load and Installed Capacity MW by Sub-Area – 2003 (Peak Loads – 50/50 F/C) VT Load 1203 839 MW Under Construction RTEP LoadCapacity NB-NE - 700 Phase II - 1500 Highgate - 210 HQ NB Orrington South – 1050 Surowiec South - 1150 ME-NH – 1400 ME S-ME BHE Load 956956 MW Load 5331516 MW Load 312942 MW NH Load 16174006 MW Boston – 3600 East-West – 2400 BOSTON North-South – 2700 Load 52223613 MW NY-NE – 1550w/o Cross Sound Cable W-MA CMA/NEMA Load 19633681 MW Load 1634 206 MW NY SEMA/RI – 3000 SEMA RI CT Load 25503356 MW CSC -300 Load 22665140 MW Load 33504437 MW South West CT – 2000 SEMA – 2300 KEY: Connecticut Import– 2200 NOR Regional Transmission Expansion Plan Sub-area SWCT Load 1251444 MW Load 2263 2036 MW Priority Studies Required FORECAST SUBJECT TO CHANGE - SEE SLIDE 2 Norwalk-Stamford – 1100 Other Studies Required

  39. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  40. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  41. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

  42. FORECAST SUBJECT TO CHANGE - SEE SLIDE 2

More Related