1 / 16

Task force on Yasso model SC 12

Task force on Yasso model SC 12. Alexandra Freudenschuß. Department of Forest Inventory. JRC technical workshop on reporting LULUCF. Arona. 06.05.2014. Specific contract 12. Framework contract for the provision of forest data and services in support to the European Forest Data Centre

jiro
Download Presentation

Task force on Yasso model SC 12

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task force on Yasso modelSC 12 Alexandra Freudenschuß Department of Forest Inventory JRC technical workshop on reporting LULUCF Arona 06.05.2014

  2. Specific contract 12 • Framework contract for the provision of forest data and services in support to the European Forest Data Centre • Reference: 2012/ S 78-127532 of 21/04/2012 • within Task 3 of the LULUCF MRV project: • Input to improving the comparability in MRV • across EU MS

  3. General objective • Provide support to a limited number of Member States on modeling carbon stock change of forest mineral soils • The contractors have experience on modeling soil carbon stock changes of forest lands in the context of GHG inventories • → use Yasso07 in their UNFCCC/KP reporting

  4. Specific tasks of SC 12 • Presentations at JRC LULUCF workshop • Set up of a forest soil modeling task force (TF) • State of the art on forest soil modelling • Preliminary model runs in the selected MS

  5. TF on forest soil modeling • Four contractors: • Administration: IGN (FR) • SC Biomass team: Metla (FN), WSL (CH), BFW (AT) • Selected MS: • EE, FR, RO, ES • out of eight interested countries; • criteria of selection: data availability, human and technical resources, geographical representation of EU countries, ecological gradient and actual reporting system

  6. Work progress • Contact established to all four MS • Successful installation of Yasso07 and model runs with sample data • Identification of suitable, country-specific data sets • Data preparation and data enquiry • First, preliminary model runs - Spain and France • Active collaboration between contractors and MS (meetings, email exchange)

  7. YASSO – Input data • Vegetation and Litterfall (time series of litter quantity, natural mortality, harvest) – preferable NFI data of several decades • Litter quality (fractions of acid-, water-, ethanol and insoluble material) • Weather data (mean annual temperature, precipitations and temperature amplitude)

  8. National data sets

  9. Site selections France Spain Fig. 1: Location of RENECOFOR sites (Level I) Fig. 2: Location of the 3 provinces – Navarra (N), Murcia (SE), Madrid (central).

  10. Preliminary results - Spain [t/ha] C-stocks at the 5 plots in Rascafria (Madrid region) [t/ha] [years] [years] Figures 2-7: SOM trend. Blue line: mean SOM (t/ha). Red Lines: 95% Confidence Intervals of the mean.

  11. Preliminary results - Spain • Lack of information of the turnover of the leaves/needles for some Iberian species. • Lack of knowledge of the turnover of the loss of coarse roots and branches. • Lack of data on chemical quality for some tree species. • NFI do not always registered forest management – identification of harvest and logging is often difficult • Data are available from 2-3 comparable NFI cycles of 10 years. Longest available time period is 30 years. • Data gaps increase uncertainty of model results • Compared to field data Yasso07 results overestimate C-stock but the trend is similar.

  12. Preliminary results - France Mean total C-stocks over 102 sites [t/ha] Current limitations/assumptions: • Spinup to initialise the Yasso runs and averaging inputs for simulation until observed values are available; • No uncertainty analysis to minimize run time; • Climate currently mean 1971-2000; • C stock estimate lower compared to observation (ca. 70 t C/ha) but ok for a first estimate [years] Figure: Mean total (soil and litter) C stock over 102 sites.

  13. Expected challenges • Application of Yasso07 at sites with extended drought conditions • Information on the decomposition of litter and deadwood into four chemical compounds may not be sufficient to apply Yasso at sites with highly mixed tree species.

  14. Next steps • Finalisation of data preparation: biomass and weather time series (esp. EE, RO) • Set up and/or further improve Yasso07 model runs with country-specific data • Exchange experience on Yasso07 application at sites with extended drought conditions (FR, ES) • Draft final report ready in July 2014

  15. YASSO Expert team • Aleksi Lehtonen – Metla (FN) • Markus Didion – WSL (CH) • Robert Jandl – BFW (AT)