December 1, 2016TACUpdate to COPS Michelle Trenary December 14, 2016
PRS Update • Confirmation of PRS Chair and Vice-Chair Approved • Chair: Amanda Frazier, Vistra Energy • Vice-Chair: Martha Henson, Oncor • NPRR792, Changing Special Protection System (SPS) to Remedial Action Scheme (RAS) Approved • NPRR803, Remove Grey-boxed Language from NPRR439, Updating a Counter-Party’s Available Credit Limit for Current Day DAM Approved • Other Binding Document ListApproved • Removal of the PCRR Allocation Eligibility Form from the OBDs list 2
Revision Requests Previously Tabled by TAC • NPRR773, Broadening Scope of Acceptable Letter of Credit (LOC) Issuers Approved • PGRR051, Alignment with NPRR792, Changing Special Protection System (SPS) to Remedial Action Scheme (RAS) Approved • NOGRR164, Alignment with NPRR792, Removing Special Protection System (SPS) and adding Remedial Action Scheme (RAS), URGENT Remains Tabled • Appeal of NOGRR149, Revision of Definition of Transmission OperatorTabled until the January TAC meeting 3
ROS Update • NOGRR162, Process for Resolving Real-Time Data Discrepancies Approved • PGRR042, Regional Transmission Plan Model Reserve Requirement and Load-Generation Imbalance Methodology Approved • Concerns raised regarding proposed use of the “bounded higher of” methodology; the disparate values used in the Load Forecast for each Weather Zone; and the need for two additional FTEs • Areas of most concern are not planned until January 2018, allowing time for an evaluation period • ERCOT will provide additional information regarding the need for two additional FTEs; ERCOT will begin next year’s Regional Transmission Plan in January 2017 and PGRR042 will have a direct impact on the methodology and assumptions used to develop the plan 4
WMS Update • SMOGRR018, EPS Metering for Three-Wire Wye Configurations Approved • SMOGRR019, Clarification and Updates to Paralleling Current Transformers, Instrument Transfer Name Plate Photos and Loss Potential Event Logging Requirements Approved • CRR Activity Calendar Approved • Covers CRR activities through early 2019 • Includes a format change and adjusting dates for the Long-Term Auction Sequences (LTAS) 5
COPS Update • Re-confirmation of COPS Vice-Chair Approved • Vice-Chair: John Schatz, TXU Energy • COPMGRR044, Alignment with NPRR794, Relocation of Unregistered DG Reporting Requirements Tabled • TAC Assignment to COPS • Review the 2% Rule 6
ERCOT Update • DAM Make-Whole Calculation Issues • In November ERCOT staff detected a material increase in DAM Make-Whole payments subsequent to the implementation of NPRR617, Energy Offer Flexibility on June 22, 2016 • The increase resulted from a mismatch between Startup and Minimum Energy Costs used by the DAM clearing engine and those used for DAM MWPs in Settlements • Mark Ruane will present more information on the DAM Make-Whole Calculation Issue and its Settlement results to COPS (57 ODs impacted; ~$1.8M total, none met 2% resettlement threshold) • TAC assigned COPS and WMS with reviewing the 2% Resettlement Protocol language 7
ERCOT Update • Market Continuity Updates to TAC • Mark Ruane thanked the Subcommittees for their work on the broad based topic of Market Continuity • ERCOT staff plans to take the input provided and develop an NPRR or Market Guide to encapsulate the ERCOT Market Continuity Plan • ERCOT staff will return in March with the high level principles for stakeholder review 8
Questions? 14