CXC Manager’s Status Report

This report provides an update on the program level status, operations, mission metrics, data system, and Chandra grant awards discussed at the Chandra Users’ Committee Meeting on June 29, 2004.

jlydia
Download Presentation

CXC Manager’s Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004

  2. Topics • Program Level Status • Operations • Mission Metrics • Data System • Chandra Grant Awards CXC Status Report/CUC

  3. Program Level Status • The spacecraft and science instruments continue to perform extremely well, and operations continue to be routine • Mission was halted twice due to solar activity, and loads were interrupted three times for Target of Opportunity observations • One minor anomaly occurred (details in Operations Status) • No safe modes have occurred since last report (last safemode 1999) • Science planning, data processing and data distribution are proceeding smoothly • Cycle 6 Peer Review was conducted 15-17 June 04; went very well • 15 press releases, 2 additional image releases and 2 SSUs in last 6 months • Independent Implementation Review (IIR) held 11/18/03 yielded no findings and 2 observations. We submitted a final response to Observation 1, on peer review security, and are completing a preliminary response to Observation 2, on EPO strategy. • Submitted financial Program Operating Plan in April 04. The budget & staff profiles are on plan through FY05. We are ready to absorb HRC, ACIS & HETG PI subcontracts 1 Oct 04. CXC Status Report/CUC

  4. Operations Status • Spacecraft • Nominal winter eclipse season • EPHIN exhibited another brief occurrence of the supply voltage being current limited due to high temperatures (minor anomaly). In response, the temperature constraints used by mission planning have been tightened. A time-dependent maximum operating temperature is in the process of being implemented in the mission planning guidelines. • A diagnostic procedure was performed to test one possible cause of the stuck-on heater located on the Optical Bench Assembly in Zone 50. The power to a set of survival heaters, including the one in Zone 50, was turned off. After seeing no thermal response, the power was turned back on. The results indicated that the survival heater is functioning properly (i.e. it is not stuck on). The stuck-on heater is not causing a problem for operations. CXC Status Report/CUC

  5. Operations Status (con’t) • Spacecraft (con’t) • Resumed performing angular momentum unloads by scheduling them in the weekly spacecraft command loads rather than initiating them from the ground during a real-time contact. • In response to the failure of the -Y shutter motor selection relay, we patched HRC safing stored command sequences to remove mechanism commanding, in order to prevent accidental shutter closure. • The on-board computer telemetry request list was patched to read the HRC anticoincidence shield and MCP event rates. This was a necessary step toward being able to use the HRC to monitor radiation in the event that the EPHIN instrument becomes unusable. • Implemented use of the Chandra Radiation Model for predicting operating times near the radiation belt entry and exit. The more accurate predictions are expected to add ~2 hours per week or ~375 ks per year of observing time. CXC Status Report/CUC

  6. Operations Status (con’t) • Science Instruments • Science instruments are operating extremely well • Preparations for an ACIS bake-out are proceeding • HRC anticoincidence shield data are being examined as a function of radiation level in preparation for use in radiation safing in lieu of the EPHIN instrument CXC Status Report/CUC

  7. Operations Status (con’t) • Load interrupt TOOs Date Target Request 03/10/04 1ES 1028+511 24 hours 03/16/04 GRS 1915+105 3 days 05/25/04 SGR 1806-20 3 days • Operations Ground System Updates Date Version Change 01/15/04 ONLS 3.9.4 Support Linux migration, script fixes 03/05/04 FOT tools Fix Sausage command checker, other tools 04/09/04 FOT tools Enhance Sausage 05/12/04 OFLS 10.3 Chandra radiation model, rad zone automation 05/12/04 FOT tools Enhance to support OFLS 10.3 CXC Status Report/CUC

  8. Mission MetricsMUPS Fuel Usage CXC Status Report/CUC

  9. Mission Metrics (con’t) MUPS Warm Start Count CXC Status Report/CUC

  10. Mission Metrics (con’t) Scheduled Observing Efficiency CXC Status Report/CUC

  11. Mission Metrics (con’t)Observing Time CXC Status Report/CUC

  12. Data System • Data processing • Average time from observation to data delivery has continued at <1 week • CIAO and Data System Software Releases Date Release Contents include: 01/30/04 DS 7.2 MTA phase IIa, Webchaser upgrade 03/16/04 DS 7.2.1 Cycle 6 proposal software 04/22/04 DS 7.2.2 Fix to multimon 06/23/04 DS 7.3 Repro3 tools, archive V&V, L3 (beta) pipeline & tools 06/23/04 CIAO 3.1 ACIS time-dependent gain, mkacisrmf Grant Awards • Grant award process continues to be nominal • Transition to new Smithsonian-wide MIS system is still being felt: ~3 weeks to grant award (had been ~1 week) CXC Status Report/CUC

  13. Data Delivery Effectiveness CXC Status Report/CUC