1 / 15

West Acton Boardwalk

West Acton Boardwalk. Proposed Plans Friends of the West Acton Boardwalk School Committee Meeting October 16, 2008. West Acton Boardwalk. Existing Conditions. West Acton Boardwalk. Existing Conditions. West Acton Boardwalk. Existing Conditions. West Acton Boardwalk.

Download Presentation

West Acton Boardwalk

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. West Acton Boardwalk Proposed Plans Friends of the West Acton Boardwalk School Committee Meeting October 16, 2008

  2. West Acton Boardwalk Existing Conditions

  3. West Acton Boardwalk Existing Conditions

  4. West Acton Boardwalk Existing Conditions

  5. West Acton Boardwalk Existing Conditions -September

  6. West Acton Boardwalk Existing Conditions and How they Change September ↓ October ↓

  7. West Acton Boardwalk Existing Conditions - October

  8. West Acton Boardwalk • Friends of West Acton Boardwalk established • Have raised $2,900 so far, from PTO donations and T-Shirt sales ($12 and $8) • Started community outreach • Oktoberfest booth first opportunity to inform citizens of proposed plan • Website: www.boardwalk.westacton.net • Conducting survey online and in person • Community outreach is continuing • Survey results being tabulated • Plan for 11/10/2008 CPC application

  9. West Acton Boardwalk • Overall Plan • Propose ideal design for schools and community • Fund all with grants and donations • Prelim cost estimates $70k-$90k • Redesign structure to • Make handicap accessible • Allow for more and longer observation • Increase usage • Improve environmental impact • Increase educational effectiveness

  10. West Acton Boardwalk • Educational Aspects • Ideas suggested from teachers and community members • Proposing 4 interactive interpretive stations that describe the environment and habitat • Proposing dock to allow for water sampling for nature walks • Proposing small storage areas for nature walk materials • Proposing railings to allow for easier study

  11. West Acton Boardwalk • Proposed Design • Raise height over water flow level (18”-20”) • Replace wood boards with composite, recycled material • Widen by 2 feet • Add railing and toe stops • Add floating dock for water sampling • Add small walkway to “kid island” • Add solar lighting

  12. West Acton Boardwalk

  13. West Acton Boardwalk

  14. West Acton Boardwalk

  15. West Acton Boardwalk • Next steps • Get Committee endorsement (SC, BOS, etc.) • Formulate survey results • Gather more community input • Complete CPC application • Continue fundraising • Propose a plan for ongoing maintenance of new structure • Visit our website: www.boardwalk.westacton.net

More Related