1 / 9

LHC Closed Orbit for Beam 2 - December 2008

This report discusses the closed orbit of Beam 2 in the LHC, addressing convergence issues, misalignment, and orbit corrections. The results indicate good performance and the potential for achieving a very good orbit RMS in both planes.

joanneprice
Download Presentation

LHC Closed Orbit for Beam 2 - December 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHC Closed Orbit For Beam 2 J. Wenninger December 2008

  2. Closed Orbit Sector by sector dp/p offsets • RMS : 1.6 mm H, 1.3 mm V – with little effort !!! • Vertical bare orbit converged well. • Need to be careful when correcting orbits with large initial rms : convergence issues to the non-linearities • >> send in steps (~20% of full correction). • LHC fRF,cap,LHC = 400'788'963 Hz • LHC ‘Theoretical fRF,nom-LHC = 400'788‘734 Hz • Average energy offset of CO : -0.094% = -9.4 units.

  3. Horizontal Orbit 12th Sept 08 • Corrector RMS 10 mrad – with MICADO

  4. Vertical Orbit 12th Sept 08 • Corrector RMS 8.6 mrad – with MICADO

  5. Bare Orbits • Bare orbits after [linear] unfolding of all corrector kicks. • Similar quality H & V : 12 mm rms H, 11 mm rms in V – peaks ~ 30 mm

  6. Alignment • The bare orbit rms is related to the misalignment through an optics sensitivity factor k : • RMSorbit = k RMSalignment R. Steinhagen, S. Redaelli, J. Wenninger, CERN-AB-2005-087 An estimate for the rms alignment error is therefore given by rms orbit/30 = 0.36 (V) to 0.4 (H) mm

  7. ‘Ultimate’ Correction - H • Corrected orbit with SVD 240 eigenvalues (~ limit) • H rms value dominated by dp/p offset, rms 0.52 mm without dp/p contribution. • No excessive kick (but some ‘larger’ kicks around IR6 and IR8). • Typical max. kick @ 7 TeV is ~ 80 mrad.

  8. ‘Ultimate’ Correction - V • Corrected orbit with SVD 240 eigenvalues (~ limit). • V rms value down to 0.35 mm(rejecting some more or less obvious outliers). • Max offset of ‘good’ (green) BPMs is +-1 mm ! • The corrector settings reflect the systematic V offsets in S23, S34 and S45. • No excessive kick (but some ‘larger’ kicks around IR2). • Typical max. kick @ 7 TeV is ~ 80 mrad.

  9. Conclusions • The BPM system performance was great (at least for this stage). • Orbit corrections worked well and converged : optics ‘reasonable’. • Bare orbits indicate good alignment of ~0.35 to 0.4 mm. • We have to understand the funny vertical offsets in sectors 23, 34, and 45. Can be partly, but apparently not fully, explained by BPM offsets. • We can potentially achieve a very good orbit rms (<< 1 mm) in both planes with reasonable kick strengths : could can 1-2 sigma of aperture at 450 GeV !