100 likes | 438 Views
Roller Coaster Project. Get ready for a wild ride!. Letter from the Chief Executive Officer. Roller coaster Project Breakdown. Roller Coaster Design (Group Grade-30 pts.). Roller coaster Project Breakdown. Roller Coaster Design (Group Grade-30 pts.)
E N D
Roller Coaster Project Get ready for a wild ride!
Roller coaster Project Breakdown • Roller Coaster Design (Group Grade-30 pts.)
Roller coaster Project Breakdown • Roller Coaster Design (Group Grade-30 pts.) • Roller Coaster Blueprint (Group Grade-20 pts.) • Design Rationale (Individual Grade-30 pts.) • Advertisement (Group Grade- 20 pts.) • Journal and Participation (Individual Grade- 20 pts.)
timeline SCHEDULE • May 30-31 intro, time to work on design and blueprint • Design is due in class June 3/4 • June 3/4 is a workday! • June 6/7 you will have time to revisit design (first 40 min) • June 6/7 you will present your coaster and turn in EVERYTHING!
BOTTOM LINE: • EVERYTHING IS DUE ON JUNE 6/7!!
Before I let you go…. Let’s cut our tubing together Today you need to brainstorm what other materials you can bring in to support the track of your coaster! http://www.youtube.com/watch?v=-dpBVtAbKJU