RADARSAT Risk

RADARSAT Risk. RADARSAT-1 design life - Nov 2000 RADARSAT-2 Program - 12-18 months behind schedule - 36 months behind requirement Planned launch: April, 2003 Availability of Data: July(?) 2003. RADARSAT-2. RADARSAT-1 required to operate 50% beyond design life

jody
Download Presentation

RADARSAT Risk

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RADARSAT Risk • RADARSAT-1 design life - Nov 2000 • RADARSAT-2 Program - 12-18 months behind schedule - 36 months behind requirement • Planned launch: April, 2003 • Availability of Data: July(?) 2003 RADARSAT-2 • RADARSAT-1 required to operate 50% beyond design life • risk of a ‘data gap’ • high impact on CIS and CCG mandates • A Contingency Plan based on aircraft has been developed

  2. Impacts are Significant • Several gov’t departments affected: DFO, TC, INAC, IC, EC • Will prevent EC from meeting its minimum mandate for ice monitoring • Will significantly impede the CCG in ensuring marine safety in ice • Will have shipping policy implications for Transport Canada (AIRSS)IMPACTS ON: • health and safety in marine transportation • viability and efficiency of wintertime economies in Gulf of St. Lawrence, Maritimes, and Great Lakes • diversion of ships to ice-free U.S. ports • resupply of Northern communities and Arctic pollution prevention • marine environmental protection in all ice affected waters

  3. Risk of RADARSAT Data Gap • 1999 2000 2001 2002 2003 2004 RADARSAT 1 nominal power life AVAILABILITY 40% chance of failure RISK PERIOD RADARSAT 2 AVAILABILITY original launch date start of full projected launch operations date (04/2003) Risk of data gap is recognized and significant

  4. Solution Elements of a Contingency Plan • Move existing aircraft from tactical to contingency role • replacement of obsolete radar equipment on ice reconnaissance Dash-7 • High-altitude radar equipment on leased or other Gov’t aircraft • radar equipment previously used in ice reconnaissance Challenger aircraft have been acquired in Intera settlement • minimize costs through ‘stand-by’ state of readiness • costs for aircraft operations incurred only if required • Upgrade other government equipment for contingency role • other satellite processing upgrades (e.g., European ENVISAT) • Plan permits a ‘stop-gap’ reduced level of ice service

  5. Status • Partial funding for ‘Preparatory Costs’ approved ($6.5M) • 1) low altitude radar replacement • RFP bid period now open - operational in June 2002 • 2) high altitude radar • used equipment procured in FY99/01 (Intera STAR-2) • now seeking aircraft for deployment • GGC Dash-8, EC CV-580, DND Challenger, Cessna Conquest (backup commercial option) • cost-benefit studies now underway for operation mid-2001 • 3) other • preparation for ENVISAT (ingest, telecom upgrades)

  6. Aircraft Options - Initial Analysis DASH 8 CV 580 Challenger Cessna Aircraft Operator DFO-CCG EC-EPS DND Private Installation Costs High Low Moderate Moderate Operation Costs Low High High Low Operation Capacity Mission Compatible Uncertain Arctic Proven Uncertain Gulf, East Low/ New High/ Old Low/ New Low/ New Risk/ Age Other Good links to CCG possible DND value in radar low mgt. effort, industry benefit Support to other EC program