Region 11 Deck Replacements (3 Bridges) PIN X807.23, Contract No. D900037 Draft Request for Proposals Informational Meeting December 22, 2016. Region 11 Deck Replacements (3 Bridges) Design-Build Project (PIN X807.23; D900037). Department’s Designated Representative for this Procurement is:
E N D
Region 11 Deck Replacements (3 Bridges) PIN X807.23, Contract No. D900037 Draft Request for Proposals Informational Meeting December 22, 2016
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Department’s Designated Representative for this Procurement is: Suzan Ibrahim Attn: Region 11 Deck Replacements Design-Build Project Office of Contracts Management New York State Department of Transportation 50 Wolf Road, 6th Floor Albany, New York 12232, USA email: suzan.ibrahim@dot.ny.gov
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Agenda • Project Overview • Department’s Goals & Project Requirements • Scope of Work and WZTC • Status of ROW and Utilities • General Contract Information • Alternative Technical Concepts • Procurement Schedule • One-on-One Meetings • RFP Content • Quality Control & Quality Assurance • Evaluation and Selection • Additional Information and Submission Guidelines • Questions and Answers
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) • The project involves Design-Build services for Deck Replacement and miscellaneous repairs for three bridge • One Bridge is located in Bronx County, one Bridge is located in Kings County and one Bridge is located in Queens County
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)Goals • Complete the Project in the shortest overall construction duration. • Minimize construction impacts on public by employing accelerated construction techniques • Extend service life by 40 years • Improve bridge maintainability by eliminating deck joints • Upgrade sub-standard features of the bridges • Ensure the safety of the traveling public;
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)Goals • Deliver the Project safely, on schedule and within budget. • Ensure coordination with utility owners, third parties, the surrounding residential community, Project stakeholders and any adjacent construction projects. • Ensure the Project is compliant with the project’s environmental requirements.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)Goals (continued) • Maximize the impact of the public investment project by: • Providing cost-effective solutions that maximizes value over the life of the three Bridges; • Sequencing construction to minimize effects on vehicular traffic operations; • Reducing future maintenance requirements; • Minimizing effects on residential neighborhoods and business communities; and • Minimizing impacts on the environment. • Provide best value to the Department.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)General Scope of Work • Superstructure and Substructure repairs • New concrete deck slab and wearing surface • Replace approach slabs • Replacement of all existing bridge deck features, including sidewalks, curbs, parapets, fencing and guiderails • Resurfacing of asphalt and new sidewalks and curbs at bridge approaches, including ADA curb ramps at intersections • Limited structural steel repair and/or replacement • Partial Painting of structural steel • Bearing replacement (with elastomeric)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)General Scope of Work • Joint elimination and/or replacement • Lighting replacement • Utility Work • Replacement of utility supports • Drainage repair • Work Zone Traffic Control • ITS/Traffic Monitoring features • Coordination with the local community to inform them of potential impacts and mitigations during various construction stages.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) • 86th Street over Gowanus Expressway • Consider HOV lane on Gowanus with Pier work • On bridge parking disruptions • Approach slabs at ramp intersections • Repair abutment embankments • Repair wingwalls, as needed
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) • Randall Ave over Throgs Neck Expressway • School nearby • On bridge parking disruptions • Repair abutment embankments • Replace brick facing at piers with concrete surface using a brick pattern form liner
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) • Lefferts Blvd. over Belt Parkway • Letter of Intent to Permit from NYCDPR included in RFP • 6 inch increase in width of sidewalks (One foot increase in out to out width of Bridge Deck) • Pier replacement above footings • Remove and replace portion of abutments • Replace fascia stringers • Steel repairs
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037)Work Zone Traffic Control • Design Builder shall implement Work Zone Traffic Control and Closures Restrictions in accordance with Section 15 of Part 3 - Project Requirement and NYCDOT OCMC Stipulations included in Part 7 – Engineering Data. • Pedestrian traffic shall be maintained through the Project area at all times at all locations where pedestrian access currently exists.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Right-of-Way • The Department owns all Right-of-Way needed for the Project • No additional Right-of-Way acquisitions or temporary easements are anticipated to be required for this Project
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Coordination – Existing Utilities In accordance with Part 4 – Utility Requirements, the Design-Builder is responsible for: • Verifying utility facility locations • Identifying and resolving any conflicts not yet documented • Coordinating with utility owners for utility relocations • Providing stakeout and final layout of utility relocations • Protecting existing utilities • Cost to repair damages to utilities caused by the Design-Builder • Informing the Department of all meetings and correspondence with utility owners
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Inventory BIN 1065230 86th St. over Gowanus Expressway • Verizon has six (6) Multiple Tile Ducts (MTDs) under Bridge in bay 9 and nine (9) MTDs under Bridge in bay 11; • Con Ed (electric) has eight (8) 4 inch transite conduits supported by the deck under the Bridge in bay 1 and two (2) 4 inch transite conduits supported by the deck under the Bridge in bay 11; • National Grid (gas) has a 12 inch live Gas Main located under the Bridge in bay 8 • FDNY has one (1) Fire Alarm conduit under the Bridge in bay 11
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Inventory BIN 1066120 Randall Ave. over Throgs Neck Expway • Verizon has four (4) 3.5 inch iron pipe ducts encased in concrete under the Bridge in bay 2; • Con Ed (electric) has six (6) 4 inch transite conduits supported by the deck under the Bridge in bay 2; • Con Ed (gas) has an 8 inch gas main within a steel casing pipe located under the Bridge in bay 9; • FDNY has one (1) 4-wire conduit in the deck.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Inventory: BIN 1076650 Lefferts Blvd. over Belt Parkway • Verizon has eight (8) 3.5 inch transite ducts located in the east side sidewalk; • Con Ed (electric) has two (2) 4 inch conduits located in the west side sidewalk; • FDNY has one (1) fire alarm cable in one duct located in the east side sidewalk; • There are also two unknown utilities on the Bridge. Verification of owners and coordination to maintain unknown utilities during construction shall be required by the Design-Builder.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Coordination – Existing Utilities Two types of Utility Work to be discussed: • Relocations to be performed by Others • Relocations to be performed by the Design Builder
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Coordination – Existing Utilities Relocations to be Performed by Others
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Others – All Bridges • FDNY will splice new cables in the manholes.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Coordination – Existing Utilities Relocations to be Performed by The Design-Builder
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1065230 • Verizon (Telecommunications) • Protect and maintain the existing conduits and wiring under the bridge during construction, including six MTD’s in bay 9 and nine MTD’s in bay 11. • Furnish and install six 4-inch fiberglass ducts under the bridge supported on steel framing. The ducts are to be dead-ended (capped) at the bridge abutments.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1065230 • Con Ed (Electric) • Protect existing conduits under the bridge during construction, including eight 4-inch transite ducts in bay 1 and two 4-inch transite conduits in bay 11. • Construct new supports for the existing conduits from the steel stringers. • National Grid (Natural Gas) • Protect the existing 12-inch gas main during construction.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1065230 • FDNY • Replace the existing 3-inch conduit under the bridge in bay 11 with a new 4-inch conduit with new supports and protect it during construction. • The Design-Builder is also responsible for the following: • One additional 4-inch conduit under the bridge, • Extension of the two 4-inch conduits off the bridge to the nearest manholes on either side. • Drag lines and 10 pair fire alarm cables, one in each conduit, from manhole to manhole. • Replacement of the existing FD post conduit with one new 4-inch PVC and 90 degree PVC elbow and 2 new 10 pair fire alarm cables from existing fire alarm post to existing FD manhole in Gatling Place
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1065230 • FDNY (cont.) • Purchase and coordinate the pickup of the necessary cables from the FDNY to install and shall schedule all necessary inspections during construction and the final inspection. FDNY Communications Electricians will perform the live cable splicing (service transfer) of all new cables that are installed in the manholes and in the existing fire alarm post. • Notify the FDNY Facilities Plant Operations Engineering Group 72 hours prior to and upon completion of the proposed conduit, drag line and conductor installation work to allow for FDNY inspection and FDNY Electricians to transfer the live service (cable splice) in the manholes and in the existing fire alarm post.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1065230 • FDNY (cont.) • Coordinate with and provide support to FDNY crews performing specialty work as required, within the project limits, including M.P.T., flagmen and relocation of barriers or obstructions to performing work.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1066120 • Verizon (Telecommunications) • Remove two existing empty 3 ½-inch iron pipe ducts encased in concrete and maintain and protect during construction the remaining two occupied ducts enclosed in a new single split steel duct. • Install eight 4-inch fiberglass ducts under the bridge and continue as eight 4-inch PVC ducts in the roadway dead-ended at the end of the approach slabs.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1066120 • Con Ed (Electric) • Protect the existing six 4-inch transite ducts supported by the deck under the bridge during construction and construct new supports • Con Ed (Natural Gas) • Protect the existing 8-inch gas main with 12-inch steel casing supported from the deck under the bridge during construction and construct new supports from steel stringers
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1066120 • FDNY • Replace the existing conduit in the deck with one new 4-inch conduit under the bridge, which shall be protected during construction. • The Design-Builder is also responsible for the following: • One additional 4-inch conduit under the bridge, • Two new 4-inch conduits off the bridge from bridge to each FD manhole • New drag lines and 4 pair fire alarm cables, one each conduit, from FD manhole to FD manhole.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1066120 • FDNY (cont.) • Purchase and coordinate the pickup of the necessary cables from the FDNY to install and shall schedule all necessary inspections during construction and the final inspection. FDNY Communications Electricians will perform the live cable splicing (service transfer) of all new cables that are installed in the manholes and in the existing fire alarm post. • Notify the FDNY Facilities Plant Operations Engineering Group 72 hours prior to and upon completion of the proposed conduit, drag line and conductor installation work to allow for FDNY inspection and FDNY Electricians to transfer the live service (cable splice) in the manholes and in the existing fire alarm post.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1066120 • FDNY (cont.) • Coordinate with and provide support to FDNY crews performing specialty work as required, within the project limits, including M.P.T., flagmen and relocation of barriers or obstructions to performing work.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1076650 • Verizon (Telecommunications) • Remove the existing transite enclosure around the existing eight 3 ½-inch transite telephone ducts and re-enclose the cables in split PVC ducts within the sidewalk, which shall be protected during construction. • Install four 4-inch fiberglass ducts under the bridge (between abutments) supported on steel framing and continue as four 4-inch PVC ducts in the roadway dead-ended at the ends of the approach slabs.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1076650 • Con Ed (Electric) • Remove and dispose of the existing two 4-inch ducts in the west fascia sidewalk and replace them with two new 5-inch steel ducts. The new ducts shall be supported on steel framing and located in the 2nd bay from the west fascia under the bridge. The new ducts shall also be capped at the ends of the approach slabs.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1076650 • FDNY • Replace the existing conduit in the east fascia sidewalk with one new 4-inch conduit under the bridge which shall be protected during construction • The Design-Builder is also responsible for the following: • One additional 4-inch conduit under the bridge, • New drag lines and 4 pair fire alarm cables, one each conduit, from telephone manhole to telephone manhole.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1076650 • FDNY (cont.) • Purchase and coordinate the pickup of the necessary cables from the FDNY to install and shall schedule all necessary inspections during construction and the final inspection. FDNY Communications Electricians will perform the live cable splicing (service transfer) of all new cables that are installed in the manholes. • Notify the FDNY Facilities Plant Operations Engineering Group 72 hours prior to and upon completion of the proposed conduit, drag line and conductor installation work to allow for FDNY inspection and FDNY Electricians to transfer the live service (cable splice) in the manholes.
Region 11 Deck Replacements (3 Bridges)Design-Build Project (PIN X807.23; D900037) Utility Relocations to be Performed by Design-Builder - BIN 1076650 • FDNY (cont.) • Coordinate with and provide support to FDNY crews performing specialty work as required, within the project limits, including M.P.T., flagmen and relocation of barriers or obstructions to performing work.
Region 11 Deck Replacements (3 Bridges)(PIN X807.23; D900037) General Contract Information