1 / 3

Roadmap Selection Testing

Roadmap Selection Testing. Weights of criteria to be set by 24 Feb Letter with qualification criteria to providers by 25 Feb Consolidated Requirements doc fixed (DN) and out to providers by 27 Feb Testing Scenarios & Tools to INPE and JRC by 27 Feb

joelle
Download Presentation

Roadmap Selection Testing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Roadmap Selection Testing • Weights of criteria to be set by 24 Feb • Letter with qualification criteria to providers by 25 Feb • Consolidated Requirements doc fixed (DN) and out to providers by 27 Feb • Testing Scenarios & Tools to INPE and JRC by 27 Feb • INPE and JRC feedback (testing subset) by 5 March • GCI-CT telecon on JRC and INPE feedback on 10 March • Testing Scenarios to CSR, CLH, GWP Providers on 11 March • Self-Testing from 15 to 20 March (feedback) • CSR, CLH, GWP testing by JRC and INPE from 6 to 23 April

  2. Day 2 Agenda • Review of day 1 • requirements testing scenarios – IP will update 28/2 and • ExCom deliverables • Terms of Reference – Completed during mtg • Recommendations for Long-Term Ops – changes from Plenary,etc. discussed, see Excel, GEOSEC to implement (impact on Cons Req Doc, to be propagated see below) • Work Plan – GEOSEC to update based on roadmap powerpoint • Presentation – preparation: Ivan P by 18/03 before ExCom.(cannot be Alan), presenter: Alan • 14:00 Usability Testing Reports (EPA) • (and test plan with Carlos??? • Impact of Data Sharing (deferred?) • Demo (Steve) (deferred?) • Wrap Up GEOSEC update the consolidated requirements (licence ‘open source’ and fixing doug’s version Important open issue on add-ons / plug-ins to be: GEOSec to circulate first Cons Req Text, to be circulated ASAP, refer to usability testing as justification

  3. ExCom: title, action • Terms of Reference – Acceptance • Recommendations for Long-Term Ops (incl new Cons Req? )–Acceptance • Work Plan forInformation

More Related