Interfacing with the Automatic Induction for the AFSM-100MTAC #96 Mike Winn Dave Williams Industry Co-Chair Postal Co-Chair
Status of Automatic Induction (Ai) Upgrades • Phase 1 Deployment Schedule • Purchased 210 Systems for 59 Sites • Installation: October 29, 2005 – September 30, 2006 • 112 Systems Accepted • On Schedule • Phase 2 Program • Approved by Board of Governors on May 3, 2006 • Funding for 145 Additional Ai Systems • Deployment: January – December 2007
Bundle Breakage Cost Analysis • Workgroup Telecom on May 4, 2006 • Helped Define Opportunity for Savings • Examined Various Components • Workgroup Taking Total System Approach to Costs • Focus on Lowest Combined Costs for Industry and Postal Operations
Explore Different Solutions Parallel Paths to New Environment • Maximize Efficiencies of Postal Processing – Use Flats Container That Permits Direct Induction into AFSM-100 • Minimize Costs of Mailer Preparation – Use Existing Industry Technology That Yields Output for Ai
Tests for Alternative Flat Mail Preparation 1. -“Dolly Dock” Test – July 2006 • Mailer Puts Loose Flats in Automation Compatible Trays (ACT) • Mailer loads ACTs on Dolly Docks • Mailer Transports to Southern Maryland Processing and Distribution Center • ACTs Automatically Removed and Inducted Off Dolly Docks into Ai on AFSM-100
Automation Compatible Tray (ACT) AUTOMATION COMPATIBLE TRAY
Tests for Alternative Flat Mail Preparation • Auto Prep Test – August 2006 • Automates De-bundling of Strapped Bundles Off Pallets • Places Loose Flats into ACTs • Automates Loading of ACTs onto Dolly Docks • Inducts Dolly Docks into Ai
Proposed Pallet for Auto Prep Scheme 1 Scheme 2 • Straps Only • Non-Compensated Bundles
Calendar • Plan Visit to Southern Maryland P&DC for “Dolly Dock” Test Around July 2006 • Schedule Next MTAC Meeting for August 2, 2006 from 8:00-10:00 a.m.