1 / 15

NORTHERN RAILWAY

NORTHERN RAILWAY. AN OVERVIEW. ROUTE MAP. NORTHERN RAILWAY. NORTHERN RAILWAY – AN OVERVIEW. NORTHERN RAILWAY – AN OVERVIEW. NORTHERN RAILWAY – PASSENGER SERVICES. NORTHERN RAILWAY – PASSENGER SERVICES. EARNINGS OVER NORTHERN RAILWAY (in crores). 7. FREIGHT OPERATIONS.

joie
Download Presentation

NORTHERN RAILWAY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NORTHERN RAILWAY AN OVERVIEW

  2. ROUTE MAP NORTHERN RAILWAY

  3. NORTHERN RAILWAY – AN OVERVIEW

  4. NORTHERN RAILWAY – AN OVERVIEW

  5. NORTHERN RAILWAY – PASSENGER SERVICES

  6. NORTHERN RAILWAY – PASSENGER SERVICES

  7. EARNINGS OVER NORTHERN RAILWAY (in crores) 7

  8. FREIGHT OPERATIONS • Freight loading of 27.19 MT during April to September 2013, is a new record.

  9. PUNCTUALITY OF MAIL/EXPRESS TRAINS

  10. PUNCTUALITY OF MAIL/EXPRESS TRAINS • Punctuality above 90% achieved for the months of May, August and September 2013. • A new record of 92.65% Punctuality of Mail/Express trains was made in the month of September 2013. • Intensive Monitoring, significant reduction in asset failures and rationalization of train movement through time tabling changes, brought about this perceptible improvement in punctuality of M/Exp trains. • NR has the heaviest Passenger Operation over IR with 505 Mail/Express Trains daily. • Passenger and Suburban punctuality also improved over last year.

  11. NORTHERN RAILWAY – SAFETY

  12. ASSET RELIABILITY 12

  13. NEW LINES COMMISSIONED (IN 2012-13 AND 2013-14): • DOUBLING COMPLETED: • 18 Km Doubling between Mansa - Maur Completed in 2013-14. • (Commissioning will be done after non-interlocking in Yards)

  14. NEW INITIATIVES • LARGEST UNDERPASS OF INDIA AT SARITA VIHAR – BY BOX PUSHING LENGTH 57 METERS (TOTAL LENGTH UNDERPASS IS 178 METERS IN RAILWAY PORTION. • COMPASSIONATE APPOINTMENTS – 1027 (BETWEEN APR TO SEPT’13) • SETTLEMENT CASES – 4177 (BETWEEN APR TO SEPT’13) • MACP – 6092 (BETWEEN APR TO SEPT’13) • LIMS – LEGAL INFORMATION MANAGEMENT SYSTEM IMPLEMENTED FOR EFFECTIVE MONITORING OF COURT CASES. • LARGESS – 2446 WARDS RECRUITED (BETWEEN APR TO SEPT’13) • IMPROVEMENT IN KALKA – SHIMLA RAILWAY – SPECIAL STOCK • IMPROVEMENT IN REWARI STEAM LOCOMOTIVE SHED • DEVELOPMENT OF YARD CLEANING MACHINE 14

  15. NEW INITIATIVES – Contd…. • SELECTION CALENDER FINALISED • COMPLETE SWITCH OVER TO E-AUCTION W.E.F. 01.06.2013 • IMPLEMENTED JOINT PROCEDURE ORDER BETWEEN S&T, OPERATING AND ENGINEERING REGARDING MACHINE PACKING OF TURNOUTS. • CCTV MONITORING OF BOOKING, RESERVATION & OTHER SENSITIVE AREAS. • SIG INSPECTION BY SAG OFFICERS OF HEADQUARTER AND DIVISION STARTED. 15