WP2.1 – FP4 project summaries (update: 10/11/2003)

WP2.1 – FP4 project summaries (update: 10/11/2003). 34 projects in total (down from originally 37; projects TSM, AFTEI and EU-SPIRIT removed from list) 25 final reports currently available (pdf, doc, printed) ; i.e. 74% 24 (of 25) summaries already drafted (13 DITS, 11 IABG) ; i.e. 96%

Download Presentation

WP2.1 – FP4 project summaries (update: 10/11/2003)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP2.1 – FP4 project summaries (update: 10/11/2003) • 34 projects in total (down from originally 37; projects TSM, AFTEI and EU-SPIRIT removed from list) • 25 final reports currently available (pdf, doc, printed);i.e. 74% • 24 (of 25) summaries already drafted (13 DITS, 11 IABG);i.e. 96% • 22 (of 24) summaries approved by DG TREN; submitted to GCI, DDB;i.e. 92% • deadline for obtaining final reports has expired (30/06/2003) • thematic analysis of FP4 projects to be integrated with deliverable D2.B (due January 2004) and D2.C (due July 2004) • latest checklist 'WP2.1_pending_FP4_projects_101103.xls'

  2. WP2.1 – Clusters for thematic project analysis • 4 air projects: environment (1); safety/security (1); ergonomics (1); efficiency (1) • 3 ITC projects: intermodal transport (3) • 2 rail projects: information (1); TEN (1); competitiveness (1) • 10 road projects: infrastructure provision (4); safety/security (3);intelligent transport systems (1); environment (1);awareness/ persuasion (1) • 3 strategic projects: efficiency (1);intermodal transport (1);appraisal and evaluation (1); environment (1); pricing (1);regulation (1); intelligent transport systems (1) • 2 water projects: intelligent transport systems (1); information (1)