1 / 9

VISION r

VISION r. REMODELLING PROPOSAL. Utilising Feedervision as the base model Present relay for Venezuela job uses existing hardware from established Vision 2 hardware platform Extended front panel and switch/led addition to achieve ‘look’ of a larger device

Download Presentation

VISION r

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VISION r REMODELLING PROPOSAL

  2. Utilising Feedervision as the base model • Present relay for Venezuela job uses existing hardware from established Vision 2 hardware platform • Extended front panel and switch/led addition to achieve ‘look’ of a larger device • Software modified and re-written to create recloser functionality

  3. VISION r design driven by specific project requirements. • Intention is to create a generic recloser relay to meet FKI requirements • Make use of the existing cost advantage • Absorb the functionality of high specification recloser applications • Minimise wiring, programming, reduces peripheral equipment and commissioning time

  4. New VISION r to be mechanically repackaged • PCB layouts and circuitry to be consolidated using presently used BoM • No deviation from existing and proven software & hardware knowledge base • Better use of space within the relay • New hardware arrangement to be utilised as the de facto 200 series drawout relay • New platform also for retrofit products & repackaged FV2 and AFV2 relays

  5. New format will not negate existing look • Maintained cost advantage by using existing BoM • Structurally superior • Inclusion of high current trip and close relays • Connectors can be to FKI choice • Ease of manufacture • Finished product

More Related