DDG 51 Program. Presented to: Surface Navy Association. 15-17 January 2013. Presented by: CAPT Mark Vandroff , USN Program Manager, DDG 51 Shipbuilding Program mark.vandroff@navy.mil (202)781-2177. Agenda. DDG 51 Shipbuilding Profile DDG 113-116 Status
E N D
DDG 51 Program Presented to: Surface Navy Association 15-17 January 2013 Presented by: CAPT Mark Vandroff, USN Program Manager, DDG 51 Shipbuilding Program mark.vandroff@navy.mil (202)781-2177
Agenda DDG 51 Shipbuilding Profile DDG 113-116 Status Baseline (BL) 9 New Construction (NC) IAMD Shipyard Initiatives FY13-17 Multi-Year Procurement (MYP) Flight III Update Primary Configuration Baseline Changes Design/Cost/Capabilities Trade-offs Service Life Allowance Comparison Summary
DDG 51 Class Shipbuilding Profile MS IV 10/93 MS IIIA 10/86 MS II 12/83 MS I 6/81 MS 0 2/80 ACAT ID ACAT ID ACAT IC ACAT IC FY # of Ships 62 Delivered to Fleet Flight I Flight II Flight IIA 4 Under Contract Flight III 21 Flight I Ships 7 Flight II Ships 44 Flight IIA Ships 3 Flight III Ships FUTURE AWARD FY98-01 MYP FY02-05 MYP UNDER DELIVERED CONTRACT TOTAL BIW 34 2 36 Ingalls 28 2 30
DDG 113-116 Status • DDG 113 (HII) Start Fab completed 03 Sep 12 (2.55% complete through Nov 2012) • DDG 114 (HII) Start Fab scheduled for 3 Jun 13 DDG 113 DDG 114 DDG 115 DDG 116 • DDG 115 (BIW) Start Fab completed 22 Feb 12 (11.44% complete through Nov 2012) • DDG 116 (BIW) 1ST 100 tons scheduled for 13 Jan 13
DDG 51 Program StatusBaseline (BL) 9 New Construction (NC) IAMD • BL 9 NC IAMD DDG computer program for DDGs 113-116 • Developed from AEGIS Common Source Library (CSL) • Supports all Baselines associated with IAMD • Being developed from AEGIS Modernization, BL 9 IAMD DDG • BL 9 IAMD DDG certification date is Jun 2014 • Small delta in software to address configuration differences between AMOD & NC destroyers • Approximately 95% of BL 9 NC IAMD DDG PoR software development completed • BL 9 NC IAMD DDG certification scheduled for FY17 • DDG 113 AEGIS Weapon System currently undergoing testing at Production Test Center (PTC) in Moorestown, NJ
Shipyard Initiatives • Electrical Mockups: Allows later loadout of Electronic Equipment, which decreases likelihood of damage and improves accessibility • Support Tower: Provides access and craft offices, tool/rod rooms, and restrooms in vicinity of ship during erection • Machinery Packaging: Outfitting in shop vice on ship • Planning System Integration: Shift from Craft-centric to System-centric build plan for selected systems • Dimensional Management System: Improved Accuracy Control procedures and fixtures • Ultra Hall: Maximize Outfitting Indoors and support downstream critical path • Safer • More Efficient • Cost Effective • Goal: Move as Much Work Upstream as Possible 6
FY13-FY17 Multi-YearProcurement (MYP) • FY 13-17 MYP RFP Issued 1 May 12 • Shipbuilder Bids Received 9 Jul 12 • Current Continuing Resolution (CR) Expires 27 Mar 13 • FY 2013 National Defense Authorization Act (NDAA) Enacted 2 Jan 13 • FY 2013 Defense Appropriations Act Enacted TBD • USD(AT&L) submits 30 Day Notification letter to Congress TBD • Award MYP Contract TBD
Flight III Update • Completed 2nd year of Flight III Study on 17 Sep 12 • Preliminary Design development started May 2012; completion planned for Nov 2013 • Gate 2 completed 24 Jul 12 • Gate 3 completed 26 Oct 12 • CDD and CONOPS Joint staffing underway • Preliminary Design Review (PDR) planned for 1stQtr FY14 • An Engineering Change Proposal (ECP) will be developed to reflect Flight III modifications • ECP notionally planned for initial implementation on 2nd FY16 Ship 8
Primary FY10 and Follow Changes • DER 1 • EOSS • BMD • Topside • EOSS • CBSP • NMT • SSEE Inc F • DER 2/3 • BMD • AFT VLS • VLS Mod • BMD • HVAC Upgrade • Pilot House • AWS Upgrade • CIC Display Upgrades • 03 Level • AWS Upgrade • MMSP / BMD • Radar Room 3 • AWS Upgrade • BMD 5.0 • MK45/Mod4 Gun • AWS Upgrades • GWS Upgrade (Ethernet) • CSMC • AWS Upgrades • NIXIE • SLQ-25 C • FWD VLS • VLS Mod • BMD • HVAC Upgrade • Remove Forward Kingpost • Remove Port Anchor • Next Generation Glide Slope Indicator • CIC • AWS Upgrade • CIC Display Upgrade • GWS Upgrade • BFTT • TTWCS Upgrade • MFTA Winch Room • Space and Wt, installed at PSA • CSER 1 • AWS Upgrades • VLS Mod • GWS Upgrade • TER • TTWCS Upgrade • CSER 3 • AWS Upgrade • VLS Mods • Comm Center • CBSP • SSEE Inc F • ISNS D(V)9 • NMT • CSER 2 • AWS Upgrades • CIC Display Upgrades • MMSP / BMD • Sonar Control • AWS Upgrade • ASW Upgrade • SER 1, 2, 3 • ASW Upgrade
Primary FY12 and Follow Changes • Pilot House • NAVSSI Upgrade • Topside • SSEE Inc F Deck Edge Ants. • Array Room 2 • CANES • SSES • CANES • IC Gyro Rm 2 • NAVSSI Upgrade • CIC • CANES • Comm Center • HF DAG • NAVMACS TR • CANES • IC Gyro Rm 1 • NAVSSI Upgrade • CANES • SNAP II Computer Rm • CANES • CSER 3 • CANES • CSER 2 • CANES • Sonar Control / SER 1 • CANES
Primary FY13 and Follow Changes • Mast • SEWIP Blk 2 • MOBI • Intake / Update • CRES Louvers • Pilot House • MOBI • IPDS-LR • Knudsen 320 Fathometer • CPS Fan Rooms • CBR Filter Kit Elimination • Crew Berthing • Accommodations • Physical Fitness • Boat Davit • All Electric SLAD • AMR 1 • Cross Flooding • SEWIP • AN/SLQ-32 Blk 2 • Radio Trans. Rm • GBS • Hull • Knudsen 320 Fathometer • CIC • Knudsen 320 Fathometer • Sonar • AN/SQQ-89 Upgrade • Knudsen 320 Fathometer • Stave Cable Connectorization
Primary FY14 and Follow Changes • Mast • CEC w/ CAB-S • SRQ-4 Ku-Band • AN/SPQ-9B Radar • Replaces AN/SPS-67 • Radar Room 3 • BMD • Aft VLS • BMD • Fwd VLS • BMD • MFTA • Install In Line • Radio Trans. Rm • Integrated AN/SRQ-4 • CIC • UPX-29 (V) AIMS MK XIIA • SEWIP Blk 2 • Integrated AN/SRQ-4 • CSER 2 • Total Ship Training Capability • Cooler Replacement • Sonar • AN/SQQ-89 Upgrade • AN/SQQ-89 ARR-75 Replacement • Cooler Replacement
FY16 and Follow Changes (Flight III) • Enclosures • Added P/S enclosures and stacked boats for displaced equip & stores • AMDR-S • Replacing AN/SPY-1D(V) • ACB Next / TI Next Upgrade to AWS • Obsolescence and roll-down impact changes as required • AC Plant • 5 x 300 Ton HES/C AC Plants Replacing 5 x 200 Ton AC Plants • Electric Plant • 3 x 4MW, 4160 VAC SSGTGs replacing 3 x 3MW, 450 VAC SSGTGs
Flight III Design/Cost/CapabilitiesTrade-offs * Notional FY # with 75 LT ballast
FY10 Flt IIA – FY16* Flt IIIService Life Allowance Comparison Current Baseline SPQ-9B ∆ AMDR-S ∆ Current Baseline SPQ-9B ∆ AMDR-S ∆ FY14 Flt IIA with SPQ-9B; FY16 Flt III with AMDR-S FY14 Flt IIA with SPQ-9B; FY16 Flt III with AMDR-S Current Baseline 450 VAC 450 VAC 4160 VAC 450 VAC Current Baseline 5x200T ACs 5x200T ACs 5x200T ACs 5x300T ACs FY16 Flt III with change to 5x300T HES-C AC Units FY16 Flt III with change to 3x4MW GTGS & 4160 VAC Notes: 1. - * Second ship in FY16 is designated as the DDG 51 Flight III 2. - FY10 values are calculated, out year values are projections based on Not to Exceed Design Budget Estimates 15
Summary • Four DDG 51 Restart ships under contract and starting fabrication • Shipbuilder proposals in review for FY13-17 MYP • Shipbuilders incentivized to improve production efficiency and reduce cost • Integrated Air and Missile Defense (IAMD) objective being fulfilled through evolutionary configuration baseline changes • Flight III Preliminary Design currently underway; ECP Development to follow 16