Department of Information Technology SHARE New Architecture, Hardware, Disaster Recovery, and System Upgrade Project Update. SHARE Service Manager – David Holmes Project Manager – John Prihoda March 28, 2012. DR Project Scope.
E N D
Department of Information Technology SHARE New Architecture, Hardware, Disaster Recovery, and System Upgrade Project Update SHARE Service Manager – David Holmes Project Manager – John Prihoda March 28, 2012
DR Project Scope The purpose of this project is to establish a Disaster Recovery system for the SHARE environment. The goals include: • Move SHARE to newer hardware and commodity technology • Provide for a Highly Available, Redundant & Fault Tolerant System • Increase Agility – Expandable, Flexible & Scalable • Reduce Complexity & Increase Manageability • Establish a Disaster Recovery system easily moved to a remote Disaster Recovery Datacenter.
Current Status This project has been on hold and is being restarted and pushed to completion • The new SHARE Service Manager is now in place and is making resuming this project a priority. • Hardware was implemented and software installed over a year ago, and is now out of date. • The DR system originally used the end-of-life Hitachi storage. The DR system is lacking a permanent storage solution which will need to be resolved before moving forward.
Budget Status – 12/15/10 Fund Allocated Spent Remain Appropriations $1,700,000 $1,679,745 $20,255 ERF $333,219 $341,995 ($2,776) Operational $0 $31,650 $0 Total $2,039,219 $2,053,390 $17,479 Note: The Project was certified for $2,100,000. Project financials are under review.
High Level Plan Restart the project to accomplish: • Re-platform current SHARE systems from the aging IBM systems and Hitachi storage to the “new” SHARE hardware platform ASAP • Establish DR system as a stand alone clone of SHARE Production • Move DR system to remote site when ready
Affect on Budget • Contingent on the outcome of the review and new planning. The project may incur costs associated with: • Selecting and procuring a SHARE storage solution • Procuring other server and network hardware to complete the fully independent DR system • Utilizing professional services as required to complete the project 6
Affect on Schedule • Currently we estimate new platform implementation is achievable by late August 2012 at the earliest • April to review and plan • May – July to rebuild and test hardware and technical design • July - August to perform the full set of functionality testing with Agencies prior to a Go-Live • Exact dates will result from the April planning efforts and is subject to change
Next Steps: • Review Current State • Develop Future State – Redesign as necessary • Validate Architecture with vendors • Determine gaps & solidify final design • Prepare a new Plan and Budget to complete the project