An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SOUTHWEST SCHOOLS PROJECT BFOC March 5, 2009

  2. 400 over capacity 450 over capacity 150 over capacity 300 over capacity 150 over capacity 200 150 under capacity

  3. Maxwell 150 under capacity Now at capacity with new additions Valencia Pistor 150 over capacity Hohokam 150 over capacity

  4. Proposed Site Proposed Site

  5. Top Sites for the Southwest Schools LYNN-U Mission Ajo Way Irvington Irvington Camino Verde Valencia Valencia Wade Cardinal Proposed Site Proposed Site

  6. Site #9 Proposal #3 CB Richard Ellis

  7. Via Ingresso Site(Site #9) Approximately 24 acres 2 utility easements; one 7 acre drainage easement May be able to use 2-3 acres of drainage easement K-5 or K-8 Flat and out of floodplain Located between Lynn-Urquides and Grijalva Elementary Schools .6 miles from Lynn-Urquides Access onto Mission Road Utilities are adjacent Many students could walk Mission Rd Via Ingresso

  8. Via Ingresso Tasks December 9 Board decision and authorization to execute of trade agreements Mar Hire broker to put site W and 125 (and others?) on the market hire architect June Time to sell sites to others ends August Complete trade with executed contract and at least $1.5M in escrow to help fund the school

  9. Site #1 Proposal #1 Pomegranate Farms

  10. Pomegranate Development Agreement(Site #1) 1. Trade of approximately 45 acres of TUSD property at the corner of Valencia and Cardinal for 15 acres within the Pomegranate Farms Development at approximately 9000 W Valencia Road. As an additional consideration for the trade, Pomegranate Farms will provide $3,000,000 for the construction of the school. 2. TUSD will construct a K-8 school of approximately 70,000 square feet, which could open in August of 2011. 3. CC&Rs will include an assessment on properties in the development to support the school and provide incentives for teachers.

  11. Pomegranate Site(Site #1) Approximately 15 acres Shared use for playfields Utilities and infrastructure to be installed by developer K-8 Flat and out of floodplain Located centrally in a planned 3000-unit development

  12. Questions/Comments

  13. Note: Though Site #2 is offered Site #3 is preferred. Site #2 Proposal #2 Broadway Realty and Trust

  14. Site #13 Proposal #4 Gran Tierra

  15. Final Proposal and Valuations

  16. Pomegranate Site(Site #1) Ajo Wy Approximately 15 acres Shared use for playfields Utilities and infrastructure to be installed by developer K-8 Flat and out of floodplain Located centrally in a planned 3000-unit development Valencia Rd

  17. Proposed Site Students in the Area