An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMWG Update to WMS 6-14-11

  2. Discussions • Balance of Year CRR auction • Worked well, with exception that bids cleared were significantly below 200,000 limit (due to process for round 2 of CRR auction) • Valley Import • ERCOT characterized current operation of Valley import as being based on thermal limit of 1100 MW—noting that the stability limit is very close to this level • For further discussion • Thermal vs stability limit operation -- relationship • Which limit was used by ERCOT to establish the SP Cap?

  3. WMS Assignment to CMWG from TAC • What can we identify in planning criteria to help us avoid Valley Issues in Future • “…recommend that a process be developed to address the gap between operations and planning processes to identify such constraints…” • Discussion about documenting TO planning criteria (similarities/differences) • Differences in how stability limits are studied in planning vs. how used in ops (w/ “margin”)

  4. PLWG/CMWG Activities for Ongoing Coordination between Planning & RT • Load Variability • Thermal Generation Availability • Ancillary Service • Transmission Maintenance Outages • Wind • Dynamic Line Ratings • Long Term Auto Outages • Operational Safety Margin (for Interface limits)

  5. Next Steps • Recommend WMS/ROS ask for review of how 6.5.9.2 applies (or not) to congestion irresolvable by SCED • CMWG/PLWG review of ongoing revisions to Planning Guides • Next meeting PLWG/CMWG 7/1, • Upcoming CMWG issues—obligations for 2011 CRR auction