1 / 52

Monitoring Your Landfill Chapter 08

Monitoring Your Landfill Chapter 08. Kentucky Department of Environmental Protection Division of Compliance Assistance 300 Fair Oaks Lane • Frankfort, KY 40601 Phone: 502.564.0323 • 800.926.8111 • Fax: 502.564.9720 Email: envhelp@ky.gov • Website: dca.ky.gov.

jorryn
Download Presentation

Monitoring Your Landfill Chapter 08

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Monitoring Your LandfillChapter 08 Kentucky Department of Environmental Protection Division of Compliance Assistance 300 Fair Oaks Lane • Frankfort, KY 40601 Phone: 502.564.0323 • 800.926.8111 • Fax: 502.564.9720 Email: envhelp@ky.gov • Website: dca.ky.gov

  2. Would this be suspicious if you were the operator?

  3. What are the groundwater and surface water monitoringproceduresassociated with each landfill type?

  4. Chapter 08 General Objective Explain the monitoring procedures associated with each type of landfill (with emphasis on groundwater and surface water monitoring).

  5. Chapter 08 Specific Objectives • Understand Environmental Performance Standards. • Explain the purpose and the requirements of surface water and groundwater monitoring. • Know the importance of proper sampling and the considerations that should be given to surface water and groundwater.

  6. Chapter 08 Specific Objectives • Understand Data Submittal Requirements. • Comprehend the assessment monitoring and corrective action process. • Identify the equipmentused to test for explosive gas. • Understand the recordkeeping system.

  7. Environmental Monitoring • All waste sites and facilities must comply FULLY with EPS in . . . • 401 KAR 47:030 (for solid waste sites) • 401 KAR 30:031 (for special waste sites)

  8. Environmental Monitoring • Environmental Performance Standards (EPS) • Pollutantsshall NOT be discharged into surface waters of the Commonwealth • Groundwater shall NOT be contaminated beyond a point of compliance for the facility in excess of drinking water MCLs • Concentrations of explosive gas in facility structures shall not exceed 25%LEL for methane or 100% LEL for methane at the facility property line.

  9. Environmental Monitoring Monitoring Plans Included in Permit Applications • Surface Water Monitoring Plans • Groundwater Monitoring Plans • Methane Monitoring Plans Landfill Type • Special Waste • Residual • CDD • Contained Each facility MUST BE MONITORED in accordance with APPROVED PLANS and the PERMIT.

  10. Surface Water Monitoring • Surface water sampling • Allows for verification that leachate is NOT entering surface water • Facility operations are NOT otherwise adversely impacting surface water • Surface water monitoring points must be located to characterize the quality of water unaffected by the landfill and water that leaves the landfill in surface drainage.

  11. Surface Water Monitoring • EVERY landfill should have • AT LEAST one upgradientmonitoring point • AT LEAST one downgradientmonitoring point

  12. Surface Water Monitoring • UpgradientMonitoring Point • Upstream from the landfill OR • Outside of the effects of waste placement for use in background comparisons • May be a SURFACE STREAM

  13. Surface Water Monitoring • DowngradientMonitoring Point • Located on the inlet side (landfill’s surface water run-off ditches) of the surface water sediment structures to monitor the landfill runoff water BEFORE it enters the sediment ponds • Can be done in the RECEIVING STREAM

  14. Surface Water Monitoring • Grab Samples • Collected at previously specified points approved by the Division, on a QUARTERLY BASIS • Parameters • Chlorides • Sodium • Sulfate • Total Organic Carbon (TOC) • Iron • Specific Conductance • pH • Solids (TSS, TDS, TS) Chemical Oxygen Demand • Other parameters in the permit

  15. Surface Water Monitoring • All facilities with storm water runoff structures and point source discharges are required to have a KPDES from the Division of Water. • Documentation that the application has been submitted will be required during the Division of Waste Management permitting process.

  16. Groundwater Monitoring • The groundwater monitoring system approved within the application is meant to allow an accurate assessment of the groundwater quality and characterize groundwater flow.

  17. Groundwater Monitoring • Residual, CDD, Contained Landfills • must have at least 1 background well hydraulically upgradient from the disposal area • at least 3 downgradient monitoring wells with the Division’s approval • Special Waste Landfills • must have at least 1background well hydraulically upgradient from the disposal area • at least 2downgradient monitoring wells with the Division’s approval

  18. Groundwater Monitoring • The division may approve springs in addition to, or instead of downgradient wells. • An alternate monitoring plan may be used if approved by the Division.

  19. Groundwater Monitoring • 401 KAR 47:180 • A groundwater characterization shall contain • Thechemical characteristics of the upper most aquifer down to and including the lowest aquifer that may be affected by the site or facility. • Results of analysis of at least two (2) samples of groundwater collected at least 30 days apart from the site before waste placement for the parameters listed in 401 KAR 48:300, Section 10. • Special Waste Landfills must perform groundwater characterization according to 401 KAR 45:160, Section 7.

  20. Groundwater Monitoring • Improved background characterization • Includes two years of quarterly data, or • eight samples per well, before waste disposal begins • More monitoring data collected prior to waste placement can facilitate the use of an intra-well statistical method, which may help overcome geological and chemical variability between upgradient and downgradient wells.

  21. Groundwater Monitoring • Groundwater sampling intervals and parametersdiffer for each type of solid or special waste site or facility • Residual landfills monitor quarterlyfor parameters determined by the Division based upon the chemical analysis of the waste to be disposed (401 KAR 48:300 section 11(4))

  22. Groundwater Monitoring Residualor Special Waste Landfill applicants should do an industrial waste analyses for the chemical parameters based on a review of raw materials feed dataor an analyses of the chemicals from one of the following: • The “Long List” of parameters for contained landfill assessment or characterization monitoring available in 48:300, Section 10(3)(b), • The Hazardous Constituent List in 40 CFR 261 Appendix IX, • The parameters included in the NPDES Priority Pollutant List

  23. Groundwater Monitoring Detected chemical constituents could become the characterizationor assessment list while the top two or three concentrated metals or organicswith common indicators could make up the detectionor quarterly (or, semi-annual for special waste) monitoring.

  24. CDD Landfill Groundwater Monitoring Parameter Requirements

  25. Residual Landfill Groundwater Monitoring Parameter Requirements

  26. Special Waste LandfillGroundwater Monitoring Parameter Requirements

  27. Contained Landfill GroundwaterMonitoring Parameter Requirements

  28. Contained Landfill GroundwaterMonitoring Parameter Requirements

  29. Data Submittal All lab results must be submitted, within 60 days of the sampling eventor 15 days after receipt of the statistical analysis–whichever is sooner.

  30. Data Submittal • Statistical analysis MUST be performed SEPARATELY for EACH • Parameter • Sampling Event • Well • Used to determine if there has been a significant increase over background values for each parameter that lacks an MCL

  31. Data Submittal If laboratory delays are encountered, a letterrequesting an extension must be sent to the Solid Waste Branch, Permit Review Section

  32. Data Submittal: Contamination • Owner or Operator MUST notify Division within 48 hours of analysis receipt • Arrange to split confirmation samples within 10 days ofanalysis receipt • Drinking Water Supply • IF probable contamination source is landfill • Facility shall provide alternative drinking water supplies to all affected parties within 24 hours of the notification of the Division

  33. Data Submittal: Exceedance • If the confirmation sampling verifiesthat an exceedance has occurred, the landfill must prepare a groundwater assessment plan, and submit it to the Division within 30 days. • Assessment Plan must specifythe way in which the landfill intends to determine: • the existence, quality, quantity, areal extent, and depth of groundwater degradation, and • the rateand directionof migration of contaminants in the groundwater.

  34. Data Submittal: Exceedance • The assessment plan must be implemented within 60 days of its approval by the Division. • If the Division determines that the assessment plan is inadequate, it can either • Issue a Notice of Deficiency (NOD) or • Modify the plan and approve it as modified. • The Division may require abatement measures prior to the approval of the assessment plan.

  35. Data Submittal: Exceedance • Within 90 days of the implementation of the assessment plan, the landfill must submit an assessment report • Summary of the data collected in the assessment investigation, • Analysis of the data, and • Recommendations on the necessity of abatement. • Within 120 days of the approval of the assessment report, the landfill must submit a corrective action plan.

  36. Corrective Action Plan • The methodsthat will be used to abate the groundwater contamination • The actionsthat will prevent further releases from the facility • The processby which affected water supplies will be restored or replaced; and • Any other measures necessary to protect human health and environment

  37. Groundwater Assessment Report • Within 15 days of approval of the groundwater assessment report, the Cabinet prepares a public notice for the owner or operator to advertise in the newspaper. • The notice must summarize the findings of the report, including proposed remedies, and allow for a 30-day comment period. • 401 KAR 48:300, Section 8

  38. Data Submittal: Exceedance • Corrective action must be performed • until drinking water parameters are lowered below MCLs, or • non-drinking water parameters are returned below background • 401 KAR 48:300, Section 8(14)

  39. Sample Collection ALL landfills that are required to monitor groundwater and surfacewater must have samples collected using proper and permitted collection procedures. The landfill manager must ensure proper collection techniques are followed so that the sample is NOT contaminated.

  40. Documentation of Construction Requirements Each landfill facility is REQUIRED to • DOCUMENT the CONSTRUCTION of: • Liners • Hydrologic Systems • Surface Water Drainage Devices • Groundwater Well Installation • Leachate Collection System • Final Cap

  41. Documentation of Construction Requirements The owner’s qualified representativemust SUBMIT a CERTIFICATION REPORTensuring that the facility was constructed in accordance withapproved plans immediately upon completion.

  42. Documentation of Construction Requirements • SOIL COVER REQUIREMENTS • Daily • Interim • Long-term • Final • 401 KAR 48:170, 48:060, 48:080, 45:110 • Documentation maintained onsite for operators, managers, inspectors, and for compiling quarterly reports

  43. Documentation of Construction Requirements • LEACHATE REQUIREMENTS • Quantity and Concentration Removed from Site • Disposal Location • Method of Disposal • Contact Wastewater Treatment Plant Owner for assistance in selecting appropriate parameters when applying for permit • Groundwater Characterization in 401 KAR 48:300, Section 10

  44. Additional Reporting Requirements • ContainedandCDD landfills • Must weigh ALL waste entering the landfill for disposal • Must keep records on the • source(county and state of origination) • quantity(in tons) of all wastes received • Ownersof contained landfills • Must record the disposal locations for • All spill residues • Limited quantity generator wastes • Unless a variance has been obtained from the Division

  45. Quarterly Data Submittal 401 KAR 47:190, Section 8 • Requires Quarterly Reports • Submitted to the Division of Waste Management • Documents compliance with recordkeeping requirements • Maintained onsite for at least THREE YEARS (3) for review by the regional inspector

  46. Quarterly Data Submittal • First Quarter Reports • January, February and March • Reports Due April 15. • Second Quarter Reports • April, May and June • Reports Due July 15. • Third Quarter Reports • July, August and September • Reports Due October 15. • Fourth Quarter Reports • October, November and December • Reports Due January 15. Reports are to be submitted on forms approved by the Division on the following schedule:

  47. Quarterly Data Submittal The owner or operator shall maintain records from all groundwater monitoring wells and associated groundwater surface elevations, for the active life of the facility, and for the closure care period as well.

  48. Quarterly Data Submittal • Owners or Operators normally submit construction reports as produced, instead of waiting for the quarterly report deadlines. • There is no need to duplicate the report when the remainder of environmental monitoring comes due.

  49. Chapter 08 General Objective Explain the monitoring procedures associated with each type of landfill (with emphasis on groundwater and surface water monitoring).

  50. Chapter 08 Specific Objectives • Understand Environmental Performance Standards. • Explain the purpose and the requirements of surface water and groundwater monitoring. • Know the importance of proper sampling and the considerations that should be given to surface water and groundwater.

More Related