Crash Program to Reconfigure LBNE

LBNE Reconfiguration Jim Strait, LBNE Project Director Fermilab Community Advisory Board August 23, 2012. Crash Program to Reconfigure LBNE. community input. Community input Steering Committee. Steering Committee + working groups formed (April 3 , 2012). Workshop (April 25-26, 2012).

josh
Download Presentation

Crash Program to Reconfigure LBNE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBNE ReconfigurationJim Strait, LBNE Project DirectorFermilab Community Advisory BoardAugust 23, 2012

  2. FCAB -- Aug 23, 2012

  3. Crash Program to Reconfigure LBNE community input Community input Steering Committee Steering Committee + working groups formed (April 3, 2012) Workshop (April 25-26, 2012) Steering Committee Kickoff meeting (April 9, 2012) Interim Report (June 5, 2012) HEPAP meeting (August 27-28, 2012) Final Report (August 6, 2012) Brinkman’s charge (March 19, 2012) Steering Committee face-to-face meeting (April 26, 2012) Steering Committee face-to-face meeting (May 22-23, 2012) DPF news letter to solicit community feedback on the interim report (July 3, 2012) Brinkman’s letter in response to the interim report (June 29, 2012) DPF announcement for workshop and community input to SC (April 15, 2012) Input to the European Strategy Group (July 30, 2012) 12 steering committee teleconference meetings numerous working group meetings

  4. Workshop (April 25-26, 2012) More than 200 participants ~5 hours devoted to community voice

  5. Open Process http://www.fnal.gov/ directorate/lbne_reconfiguration All documentation on this web site

  6. FCAB -- Aug 23, 2012

  7. Sample with bullet points LongBaselineNeutrinoExperiment Original Design • First Bullet • Second Bullet • More • Yet more • Still more • Less important • Trivial New Neutrino Beam at Fermilab… Precision Near Detector on the Fermilab site Directed towards a distant detector 34 kton Liquid Argon TPC Far Detectorat a depth of 4850 feet (4300 mwe) J.Strait, FRA Visiting Committee Meeting, April 12-13, 2012

  8. Sample with bullet points LongBaselineNeutrinoExperiment First phase of the reconfigured program • First Bullet • Second Bullet • More • Yet more • Still more • Less important • Trivial New Neutrino Beam at Fermilab… Precision Near Detector on the Fermilab site Directed towards a distant detector 34 kton Liquid Argon TPC Far Detectorat a depth of 4850 feet (4300 mwe) 10 kton Liquid Argon TPC Far Detectorjust below the surface We plan to eventually to build a Near Detector at Fermilab and an underground detector in South Dakota, either in a future phase or by obtaining resources from beyond the DOE. J.Strait, FRA Visiting Committee Meeting, April 12-13, 2012

  9. Local Impact of Reconfiguration No On-Site Detector X Smaller Hill FCAB -- Aug 23, 2012

  10. LBNE Neutrino Beamline Hill height: was 70 feet now 58 feet FCAB -- Aug 23, 2012

  11. Looking East Northeast from West Side of Kirk Road Beamline hill now 12’ lower than shown here. FCAB -- Aug 23, 2012

  12. Looking East Northeast from West Side of Kirk Road FCAB -- Aug 23, 2012

  13. EAST SIDE OF KIRK ROAD LOOKING NORTH EAST Beamline hill now 12’ lower than shown here.

  14. EAST SIDE OF KIRK ROAD LOOKING NORTH EAST

  15. LBNE Project Life Cycle & Approvals REVISED Spring 2011 2013 2014-15 2020+ May 2011 2021+ 2015-16 2014 2012 Current LBNE Schedule, Aug 2012 Dec 2012 2016 2016-17 2023

  16. Questions? Comments? FCAB -- Aug 23, 2012