Development of the acquisition system for huge data flows in Diagnostic Plant systems of the iter. I.Semenov , A.Khilchenko *, S.Portone , N.Marusov , E.Mironova , E.Rogova , “Project Center ITER” Russia, Moscow, sq. Academic Kurchatov sq., 1
E N D
Development of the acquisition system for huge data flows in Diagnostic Plant systems of the iter I.Semenov, A.Khilchenko*,S.Portone, N.Marusov, E.Mironova, E.Rogova, “Project Center ITER” Russia, Moscow, sq. Academic Kurchatov sq., 1 *BINP SO RAS, Novosibirsk, prosp. Lavrentieva 11 E-mail: i.semenov@iterrf.ru, A.D.Khilchenko@inp.nsk.su, s.portone@iterrf.ru, n.marusov@iterrf.ru, e.mironova@iterrf.ru, e.rogova@iterrf.ru, GRID2012, Dubna, July 16-20, 2012
ITER • Major plasma radius: R - 6.2 м • Minor radius: a - 2.0 м • Plasma current: 15 MA • Объем плазмы:815 м3 • Toroidal field BT: 5.3 T • Burning time: > 400 с • Construction: 2006(7)-2016(17) (Now 2020). • Operation: 2016-2036 • Total project coast: 10 B$ • One day operation coast: ~2.5 M$ . • Fusion Parameters : • Working gas D+T • Te=Ti= 15keV • ne=1020 m-3 • neutron flux> 1016 n/m2s • DTPower– 500 МW
~2 106 Channels Data flow - 10-100 GB/sec Plasma duration – 30 min Total Data during the year ~ 5 PB/Year ITER data distribution structure For 5 PB/Year GRID2012, Dubna, July 16-20, 2012
Bit 18 # channels required ~2000 ~ 3000 16 Estimate of ADC channels and raw data 60 GB/s *2 (no timestamp) 60 GB/s *10 (with timestamp) < 1 GB/s <40 GB/s * X ~600 14 12 ~5 ~300 Bits : Datasheet ENOB : Bits -1.5 FS 300 GB/s * 2 * DC (duty cycle = 0.1 ?) 10 Sum = (100 -1000) GB/s * Demand DC 1000 0.1 MS/s 100 10 1 GRID2012, Dubna, July 16-20, 2012
ITER control room(IBM proposal) GRID2012, Dubna, July 16-20, 2012
Физическая архитектура ИТЭР I&C GRID2012, Dubna, July 16-20, 2012
Limitations in standatd fast measurement channel GRID2012, Dubna, July 16-20, 2012
Online data processing GRID2012, Dubna, July 16-20, 2012
ADC12500PXIe functional diagram GRID2012, Dubna, July 16-20, 2012
ADC12500PXIe Digitizer Prototype module GRID2012, Dubna, July 16-20, 2012
Measurement schema in ATCA standard GRID2012, Dubna, July 16-20, 2012
ADC12500:applications Error_1 = 0.0012% Error_2 = 0.4 % Cs & Co Neutron diagnostics (stilben) Gamma spectroscopy[BGO, NaI(Tl)] NaI scincillator Photomultiplier В частотной области Signal weighting function Gauss High voltage divider filter HV power source Filter responce (Timing domain) Convertion error Sрectrometer (ADC12500) GRID2012, Dubna, July 16-20, 2012