Presented by David Johnson US ITER Project Activities Near-term priorities and plans US diagnostic packages Ongoing neutronics work and plans US Burning Plasma Organization ITER-relevant diagnostic development on DIII-D (separate presentation prepared by R. Boivin).
E N D
Presented by David Johnson • US ITER Project Activities • Near-term priorities and plans • US diagnostic packages • Ongoing neutronics work and plans • US Burning Plasma Organization • ITER-relevant diagnostic development on DIII-D (separate presentation prepared by R. Boivin) ITER-Relevant Diagnostic Activity in the US
US ITER Project Has Started • In March, PPPL was been selected as the lead institution for diagnostic procurement and David Johnson was selected as Diagnostics Team Leader. • Since then there have been extensive discussions with diagnostics experts at 4 locations in the US focused on defining the scope of short term studies. • Will fund 15 - 20 studies of 2-6 man-months each. Some will start in May. • More extensive contracts for detailed design work will come later, hopefully next year, when US responsibilities are better defined and funding increases.
Near Term Priorities • Better definition of ‘front-end’ designs • understand and optimize front-end designs • examine trade-offs in expanded capability and alternate approaches • support ‘Port Plug Engineering Taskforce’, particularly in areas that affect US systems • Develop needed infrastructure • CATIA CAD models • neutronics capability • optical designs • performance simulation codes • Development of R&D plans • both in-vessel and ex-vessel components • prototyping • contribute to generic R&D work on 1st mirrors, shutters, and other “far-forward” assemblies
Near Term US Neutronics Plans Three ongoing approaches for neutronics analysis • Efficient translation from CAD to format compatible with input to MCNP • Raytheon - TOPACT being pursued by LLNL (Jeff Latkowski) • Will use US E3 port labyrinth as example • New version of MCNP that “runs within CAD elements” • MCNP-CGM M. Sawan - Univ. of Wisconsin • Ready to try on simplified port plug (E3) in mid-summer • ATTILA discreet ordinates code (Transpire - US Company) • Code “verification” plan developed by IT to be based on 3 experimental benchmarks • US has agreed (Mahmoud Youssef - UCLA) to perform ATTILA benchmark runs • To be reported at meeting organized by Gianfranco Federici at Madison, Wisconsin July 24-26 • ATTILA runs with simplified E3 plug also planned prior to this meeting as a design example (R. Feder - PPPL)
Intensive Neutronics effort is underway: Direct conversion of CAD to radiation transport grid Complex step CATIA-CAD Pro/E-CAD Step File TopAct- GRID Neutronics • LLNL has converted ITER CATIA CAD to Pro/E for local ease of use and to enable TopAct conversion • TopAct speeds the process in moving from CAD to neutronics • Contract in place with • Raytheon for them to complete the conversion from Pro/E to Monte Carlo • LLNL will become beta test user in FY06 Well in hand MCNP/TART
We are applying TopAct Grid generator to the design of ITER's MSE diagnostic • 06 Accomplishment- Neutronics calculations • Monte Carlo models (both TART and MCNP) have been completed for much of the MSE diagnostic • TopAct is beginning to deliver, and we now understand its limitations and the appropriate work-arounds Creating the ability to rapidly assess the radiation transport effects of design changes will make significant contributions to ITER and other projects, a capability developed at LLNL.
USBPO Diagnostic Activities • Diagnostic Topical Group Coordinators recently named - Réjean Boivin, Steve Allen, Jim Terry • Leaders are discussing possible Task Groups that might support US project responsibilities: • Microwave systems - ECE and Reflectometry • IR/FIR systems - Toroidal and Divertor Interferometry • Imaging systems - Upper Visible/IR Cameras • Active spectroscopy - MSE • Possible Diagnostic Task Group Roles (Need to draft charter) • Provide forum of ideas relating to US systems. • Comment on physics goals and related measurement requirements. • Organize workshops for presentation and critique of upcoming design studies. Eventually support internal review of detailed designs. • Provide experts for ITER diagnostic design reviews. • Address some types of ‘action items’ from USBPO or USIPO. • Advise US ITER Project on diagnostic issues