Status: HERA + Experimente Jahrestreffen KET 22 November 2003, Bad Honnef

Status: HERA + Experimente Jahrestreffen KET 22 November 2003, Bad Honnef. Status HERA und Untergrundprobleme Status der Experimente. Robert Klanner. HERA Operations. (Luminosity Operation with 120 bunches). Luminosity achieved. HERA II design: 5 (7.5) x10 +31 cm -2 s -1

Download Presentation

Status: HERA + Experimente Jahrestreffen KET 22 November 2003, Bad Honnef

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status: HERA + ExperimenteJahrestreffen KET 22 November 2003, Bad Honnef Status HERA und Untergrundprobleme Status der Experimente Robert Klanner Bad Honnef - 22.Nov.03 - R. Klanner

  2. HERA Operations (Luminosity Operation with 120 bunches) Bad Honnef - 22.Nov.03 - R. Klanner

  3. Luminosity achieved HERA II design: 5(7.5)x10+31 cm-2s-1 HERA II achieved 3.0x10+31cm-2s-1 HERA I design: 1.5x10+31cm-2s-1 HERA I achieved 2.0x10+31cm-2s-1 Bad Honnef - 22.Nov.03 - R. Klanner

  4. Polarisation achieved 50 % ~ 50 % achieved (with little polarisation tuning) Bad Honnef - 22.Nov.03 - R. Klanner

  5. Background – results 2002/2003  March to August ’03 shutdown for improvements Bad Honnef - 22.Nov.03 - R. Klanner

  6. Shutdown work March-Aug. 03 Major effort – successfully completed Bad Honnef - 22.Nov.03 - R. Klanner

  7. Status background - now Missing factor 3 should be achievable with HERA conditioning Bad Honnef - 22.Nov.03 - R. Klanner

  8. Status background - now Bad Honnef - 22.Nov.03 - R. Klanner

  9. Status ZEUS • First data show that detector is in excellent running state and ready for high statistics data Bad Honnef - 22.Nov.03 - R. Klanner

  10. Status H1 First data show that detector is in excellent running state and ready for high statistics data ~ 2 pb-1 of data taken Bad Honnef - 22.Nov.03 - R. Klanner

  11. Status HERMES • Detector in excellent running state • 2002/2003 and now: successful data taking • first SF measurement on a transverse polarised target from 02/03 data after 2004/2005: exclusive reactions for measurement of Generalised Parton Distributions using new Recoil Detector presently under construction Bad Honnef - 22.Nov.03 - R. Klanner

  12. HERA-B high statistics data (~300 k J/Ψ-events) in `02/`03 • data taking completed in Mar.03  analysis • new proposals for detector: • HERA-c: e.g. D0D0-mixing (PRC: not competitive – not recommended) • HERA-g: glueballs, IP/IR, Oderron-exchange, … • (PRC: still under scrutiny) Status HERA-B s Bad Honnef - 22.Nov.03 - R. Klanner

  13. Luminosity expectations • attempts of a realistic estimate (still aim for ~1 fb-1 ) • end HERA II: end 2006 ( mid 2007) – resource planning until mid 2007) • decide on exact schedule in 2004 (once HERA performance demonstrated) Bad Honnef - 22.Nov.03 - R. Klanner