130 likes | 356 Views
Status: HERA + Experimente Jahrestreffen KET 22 November 2003, Bad Honnef. Status HERA und Untergrundprobleme Status der Experimente. Robert Klanner. HERA Operations. (Luminosity Operation with 120 bunches). Luminosity achieved. HERA II design: 5 (7.5) x10 +31 cm -2 s -1
E N D
Status: HERA + ExperimenteJahrestreffen KET 22 November 2003, Bad Honnef Status HERA und Untergrundprobleme Status der Experimente Robert Klanner Bad Honnef - 22.Nov.03 - R. Klanner
HERA Operations (Luminosity Operation with 120 bunches) Bad Honnef - 22.Nov.03 - R. Klanner
Luminosity achieved HERA II design: 5(7.5)x10+31 cm-2s-1 HERA II achieved 3.0x10+31cm-2s-1 HERA I design: 1.5x10+31cm-2s-1 HERA I achieved 2.0x10+31cm-2s-1 Bad Honnef - 22.Nov.03 - R. Klanner
Polarisation achieved 50 % ~ 50 % achieved (with little polarisation tuning) Bad Honnef - 22.Nov.03 - R. Klanner
Background – results 2002/2003 March to August ’03 shutdown for improvements Bad Honnef - 22.Nov.03 - R. Klanner
Shutdown work March-Aug. 03 Major effort – successfully completed Bad Honnef - 22.Nov.03 - R. Klanner
Status background - now Missing factor 3 should be achievable with HERA conditioning Bad Honnef - 22.Nov.03 - R. Klanner
Status background - now Bad Honnef - 22.Nov.03 - R. Klanner
Status ZEUS • First data show that detector is in excellent running state and ready for high statistics data Bad Honnef - 22.Nov.03 - R. Klanner
Status H1 First data show that detector is in excellent running state and ready for high statistics data ~ 2 pb-1 of data taken Bad Honnef - 22.Nov.03 - R. Klanner
Status HERMES • Detector in excellent running state • 2002/2003 and now: successful data taking • first SF measurement on a transverse polarised target from 02/03 data after 2004/2005: exclusive reactions for measurement of Generalised Parton Distributions using new Recoil Detector presently under construction Bad Honnef - 22.Nov.03 - R. Klanner
HERA-B high statistics data (~300 k J/Ψ-events) in `02/`03 • data taking completed in Mar.03 analysis • new proposals for detector: • HERA-c: e.g. D0D0-mixing (PRC: not competitive – not recommended) • HERA-g: glueballs, IP/IR, Oderron-exchange, … • (PRC: still under scrutiny) Status HERA-B s Bad Honnef - 22.Nov.03 - R. Klanner
Luminosity expectations • attempts of a realistic estimate (still aim for ~1 fb-1 ) • end HERA II: end 2006 ( mid 2007) – resource planning until mid 2007) • decide on exact schedule in 2004 (once HERA performance demonstrated) Bad Honnef - 22.Nov.03 - R. Klanner