Grøn gas gennem metanisering

Claus Friis Pedersen clfp@topsoe.dk. Grøn gas gennem metanisering. Vehicle to grid (V2G) is the future!. An integrated energy infrastructure. CH 4 + CO 2 + 4H 2 2CH 4 + 2 H 2 O. The right factors for biogas upgrading. Haldor Topsøe group (2011). Catalyst and engineering for

josiah
Download Presentation

Grøn gas gennem metanisering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Claus Friis Pedersen clfp@topsoe.dk Grøn gas gennem metanisering

  2. Vehicle to grid (V2G) is the future!

  3. An integrated energy infrastructure CH4 + CO2 + 4H2 2CH4 + 2 H2O

  4. The right factors for biogas upgrading

  5. Haldor Topsøe group (2011) Catalyst and engineering for Fertilizers Refineries The environmental sector Synthetic fuels • Turnover: DKK 4.4 billion • Result: DKK 397 MM • 2091 employees • 250 employees in R&D

  6. Synthetic Natural Gas (SNG) - Xinjiang Qinghua • 50 PJ corresponding to >50% of the total Danish Natural gas consumption • 5 PJ gasified biomass SNG plants are projected • 0.1 PJ would be a large biogas methanation unit Transport SNG in pipelines rather than coal on trucks

  7. Fuel Cell and Electrolyser SOFC SOEC H2O H2 H2 H2O H2 + O2- → H2O + 2e- H2O + 2e- → H2 + O2- O2- O2- ½O2 + 2e- → O2- O2- → 2e- +½O2 ½O2 ½O2

  8. Exergy Flows

  9. Biogas upgrade value proposition # 1 CH4 + 30-40% CO2 Biogas BioGas CH4 40 PJ Biogas Upgrade CO2 ”Electro-gas” CH4, 27 PJ H2 Electrolysis Fuel synthesis

  10. Biogas upgrade value proposition # 2

  11. Pre studies Metan samfundet SOEC biogas upgrade

  12. The business case (w. 5% interest) 2035 91% Electrolysis 2020 100% Electrolysis Plant size: 75 mio Nm3 biogas/year Mio DKK

  13. Pilot test at Foulum – 5 Nm3/h CH4 + CO2 + 4H2 2CH4 + 2 H2O

  14. Summary • Electrolysis based biogas upgrade has the potential to: • Store electricity as fuel • Increase the biogas production • The business case is interesting but many aspects are still uncertain • A pilot scale field trial is planned for 2015