1 / 1

Integrated TT for BVOIP

2. 5. 3. 1. 4. Integrated TT for BVOIP . Ordering. Circuit, Logical & Router Provisioning. T&T (Porting). Sales / Post Sales. Post Prov. Cust/Site Readiness Check point (at minimum 5 days prior to T&T). Issue Port LSR. Request Onsite GBS Tech & T&TSME.

jovita
Download Presentation

Integrated TT for BVOIP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2 5 3 1 4 Integrated TT for BVOIP Ordering Circuit, Logical & Router Provisioning T&T (Porting) Sales / Post Sales Post Prov Cust/Site Readiness Check point (at minimum 5 days prior to T&T) Issue Port LSR Request Onsite GBS Tech & T&TSME *initial TQ roll out for NBM markets (Muscat) full transition for all regions. MDS includes sales order & CSRs Firm Quote SPP Port FOC Set I.T.T date w/ cust Conduct Integrated T&T GCSM create/ order handoff SSM Conducts TQ OM Submit USRP OM Submits GIOM OM orders router LNS porting confirmed Confirm T&T Provision Billing Update MTC GK order accept/ Logical Prov transport installed LSSD/HSSD CPDD MDS Received AT&T Ready TTU COMPLETE CTA SID access FOC DD 1 2 3 4 5

More Related