Fast Track Concrete CIMT 210 Examples: Tolls roads Public Streets Intersections Airport Other II. Specifications Planning and Construction Materials Joint and Sealing Curing and Temperature Testing Opening Traffic III. Mix Design
Examples • Toll Roads • Tollway authorities lose revenue when lane are shut down and there is much congestion, forcing drivers to find alternate routes • Public Street • Residents can gain access to their driveway within 24 hours if they live on urban streets • Intersections • Intersection suffer more pavement distress because they connect 2 or more streets. Fast track allows intersections to completed before rush hour • Airports • Fast track concrete allows contractor to operate slipform equipment on the initial paving lanes sooner than normal.
Examples • Airports Initial paving lanes Interior lanes Paving interior lanes on an airport facility (note theuse of initial lanes for construction platform)
Specifications • Planning and Construction • Check access for local traffic • Evaluate Local Business Interuption • Check for any utility work. • Secure access for equipment and operation • Check pavement edge drop-off requirement • Check for crossovers that disrupt both directions of traffic • Evaluate detour routes for level of congestion and damage to road due to prolong construction activity • By specifying fast track concrete near the end of the day will facilitate startup for next day.
Specifications • Planning and Construction – no special equipment is required for construction • Well planned construction sequences are necessary for the accelerated process • Constructing test slabs will help inexperienced workers to work with the plastic properties of fast track concrete • Concrete haul distance should be considered • Agencies should not modify their smoothness specifications for fast track concrete pavements.
Specifications • Materials • There is no specific proportioning necessary for fast track concrete. • Refer to: ASTM C 150 Type I and III cements
Specifications • Materials • Cement – ASTM C 150 Type I and III cements • High levels of tricalcium silicates (C3S) and finely ground cement particles will generate strength quickly. • Type III cement, which is finer than other PC, • develops early strengths • The problems with Type III are false sets, and a demand for excessive water and air entraining • Type I and II require chemical admixtures to gain early strength.
Materials • Pozzolanic Materials – Fly Ash or Ground –Granulated Blast Furnace slag • These pozzalanic materials extend strength gained, because tricalcium silicates (C3S) • do not extend • Fly Ash Class C and F • Class C will lower water demand, improve workability and increase long term strength • Class F will not contribute to early strength, but will extend long term strength, reduce permeability, and will combat the effects of deleterious materials, sulfates or alkalis • Flyash can slow down hydration and the final set, due to the temperature drops in hydration. • (addition of admixtures is required) Specifications
Materials • Air- Entraining Admixtures –are used to entrain microscopic air bubbles • Entrained air improves concrete durability by • reducing the effects of Freeze/thaw behavior • Fast Track concrete needs the appropriate air content of 4.5% to 7.5%. • Higher percentages of entrained air can reduce the early and long-term strength, while lower percentages will reduce the concrete durability. Specifications
Specifications • Materials • Water – Reducing Admixtures reduce the water required for workability • These admixtures can also increase early strength by lowering the quantity of water necessary for hydration. • Water reducers lowers the number of cement particles agglomerations and disperse cement particles. • Type I is most effective in early strength with water reducers..
Specifications • Materials • Accelerating Admixtures –aids strength development and reduce initial set times by increasing the reaction rate of tricalcium silicates (C3S) • Accelerating admixtures generally consist of soluble inorganic salts or soluble organic compounds • Calcium Chloride (CaCl2) is the most common • accelerator, but is a corrosive to the reinforcing • steel.
Materials • Aggregates– Grading – There is a definite relationship between aggregate grading uniformity and concrete strength, workability and long –term durability • Workability –concrete with a well graded combined aggregate will often be much workable at a low slump than a poorly graded mixture having a higher slump. • Slump- measure consistency between batches, is affected by a difference of 3.5 inch when comparing a uniform grading over a similar gap graded mix. The amount of water in the mix controls. (20-30 lbs difference) • Particle Shape and Texture – Sharp • particles are less workable than rounded • particles, but add to strength. Specifications
Materials • Water – Hydration is an exothermic process • Raising the Heat of Water can accelerate the process of hydration. (i.e. small projects, and intersections reconstruction) • Hot water is a catalyst for early hydration but it only good for short term. Several hours of heat containment require insulation for rapid strength gain. Specifications
Specifications • Joint and Sealing • Sawing – the time for sawing (sawing window) is reduced with Fast Track concrete. • Light saws which handle easy and are more versatile are more effective in Fast Track Concrete • Curing blanket is normally in place during the sawing operation and have to be removed
Specifications • Joint and Sealing • Mixes with softer limestone aggregate require less strength for sawing than do mixes with harder coarse aggregate • Contractors have successfully cut joints in fast-track construction using wet-sawing, dry-sawing and ultra – light sawing • Dry saw cutting can be performed earlier than wet-saw cutting
Specifications • Joint and Sealing • Liquid sealant - Cleaning is the most important aspect of joint • Reservoir faces require a thorough cleaning to be sure of good sealant adhesion • Proper cleaning after wet sawing requires mechanical action and pure water flushing to remove contaminants • Dry Sawing requires only an air blowing operation to remove particulate residue from the joint reservoir. (excessive dust is produced) • Preformed seals are not sensitive to dirt or moisture on side walls and may allow sealing earlier than any liquid seal.
Specifications • Curing and Temperature Maintenance – is important for the hydration within the concrete and also to prevent thermal cracking. • Monitoring of heat is required, so that contractors can adjust curing measures • Maturity testing allows for the field measurements of the concrete temperature to correlate with the gained strength • (see non-destructive testing) • Curing Compounds are liquid – membranes meeting ASTM C309. The materials create a seal that limits evaporation of mix water. The white color also reflects solar radiation • Class A liquid curing compounds are sufficient for fast track concrete
Specifications • Curing and Temperature Maintenance – (Continued) • Blanket Insulation – provide a uniform temperature environment for the concrete.It keeps the area dampened and reduce heat loss. Contractor will usually place blankets soon after applying curing compound • It is recommended that blankets should be applied after joint sawing is completed • Sawing Window – The sawing window is a short period after placement when the concrete can be cut successfully before it cracks. • The window ends when significant concrete shrinkage occurs and induces uncontrolled cracking.
Specifications • Curing and Temperature Maintenance – (Continued) • Plastic Shrinkage – forms after concrete placement due to rapid evaporation of water at the surface of the slab. • Ways to prevent evaporation conditions: • To pave during the evening or nighttime • To water mist aggregate stockpiles and subbase • To use evaporative retardant • When evaporation rate exceeds 0.2 #s/sft/hr then plastic shrinkage cracking is likely to occur.
Specifications • Testing – Non- Destructive • Maturity Testing – provides strength evaluation through monitoring of internal concrete temperature in the field. • The Nurse-Saul Method – calculates the time-temperature factor
Specifications • Testing – Non- Destructive (Maturity Test) • Arrhenius Maturity Equation – • See ASTM C 1074 • Field maturity begins with embedment of thermocouples or temperature probes and then compared to the laboratory study.
Specifications • Testing – Non- Destructive (Pulse Velocity) • Pulse-Velocity – measured the time required for an ultrasonic wave to pass through concrete from one transducer to another. • The velocity of the wave correlates to concrete strength or stiffness.
Specifications • Opening Traffic • Third –Point Flexural Strength (psi) – required to determine when roads should be open for traffic.
Specifications • Opening Traffic • The strength necessary to allow vehicles onto a new pavement will depend on the following factors: • Type, weight, and number of anticipated loads during early-age period • Location of loads on slab • Concrete Modulus of Elasticity • Pavement Design (new construction, unbonded overlay, bonded overlay, or overlay on asphalt) • Slab Thickness • Foundation Support (Modulus of Subgrade Reaction, K) • Edge support condition (widened lane or tied curb & gutter or tied concrete shoulder)
Specifications • Opening Traffic • Construction Traffic - typical construction vehicles include span saws, haul trucks and water trucks.
Specifications • Opening Traffic • Public Traffic - Flexural strength requirement for opening concrete pavements to use by public traffic. Traffic is an estimate of the total one-way ESAL’s that will use the pavement truck lane between time of opening and the time concrete reaches design strength (28 days)
Mix Design Various Mix Designs for Various Projects