Celcom Golden cluster PRE Drive test update. 2014-04-30. Serving Cell: RW10010_2_2 GAYACENTRE. Gaya street pre. Gaya street post. Serving Cell: RB10219_1_2 (In-Building Site). One borneo pre. One borneo post.
E N D
Celcom Golden cluster PRE Drive test update 2014-04-30
One borneo post *Post Hotspot was completed in lobby as nearby BlueCube area were serving by outdoor Macro site.
Hotspot analysis • Peak vs Non-Peak UL RSSI around 10dB. • Current Setting: • eulMaxOwnUuLoad = 60 (6dB) • eulMaxRotCoverage = 80 (8dB) • Propose Setting: • eulMaxOwnUuLoad = 100 (10dB) • eulMaxRotCoverage = 100 (10dB) 10 dB
Gaya street - analysis • Uu congestion counters are highly pegged on the test date. • Propose to implement features for interference suppresion: • FAJ 121 1714 INTERFERENCE SUPPRESSION • FAJ 121 2671 INTERFERENCE SUPPRESSION FOR EUL 10ms • FAJ 121 2370 INTERFERENCE SUPPRESSION FOR ALL BEARER • Propose to implement other EUL features: • FAJ 121 1673 CE capacity for HSDPA Smartphones • FAJ 121 1883 CE capacity for EUL Smartphones • FAJ 121 2598 CE Extension on EUL • FAJ 121 2444 Uplink Fast Congestion Control • FAJ 121 1443 EUL single HARQ process scheduling
Benchmarking Drive Hotspot Test • Gaya Street are having low UL throughput issues. • High UuLoad due to conservative UL parameter settings. • eulMaxOwnUuLoad = 60 => 100 • eulMaxRotCoverage = 80 => 100