1 / 11

NTR Conference 2018 NTR update

NTR Conference 2018 NTR update. Mikael Westin. NTR Board and Technical Expert Group. Martin L Petersen Henrik Magnus Skou Lisa Sjölind Joni Nousiainen Atle Nilsen David Bergene Holm Ulrik Lindgren Tommy Karlsson. Niels Morsing Petteri Torniainen Per Otto Flaete Pia Larsson Brelid

jquick
Download Presentation

NTR Conference 2018 NTR update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NTR Conference 2018NTR update Mikael Westin

  2. NTR Board and Technical Expert Group • Martin L Petersen • Henrik Magnus Skou • Lisa Sjölind • Joni Nousiainen • Atle Nilsen • David Bergene Holm • Ulrik Lindgren • Tommy Karlsson • Niels Morsing • Petteri Torniainen • Per Otto Flaete • Pia Larsson Brelid • Nasko Terziev

  3. NTR U p d a t e NTR Database; same controlling format, overview of statistics and historical data Workshops for controlling bodies; same procedure, certificates, etc New Document for other materials

  4. NTR U p d a t e Alternative to CCA as reference Round Robin for penetration evaluation Alignment for reagents

  5. NTR U p d a t e Leaching to freshwater Introduced NTR A Pole NTR recommendation, Wooden stringers

  6. NTR U p d a t e W E I WG Quality Schemes Project/Proposal for harmonisation We take a back seat position Start with controlling NTR will not marry below social status

  7. NTR U p d a t e Wood Protection Association + Timber Trade Federation Difficulties in the UK market….

  8. IED, IPPC, EIPPCB, BAT, STS/WPC, Bref, WEI, NTR and national associations

  9. Seville Process - EIPPCB November 2015 WPC 3 representatives BREF completion timescale 24 – 31 months

  10. Nordic production • Sweden 1 520 000 • Norway 474 000 • Finland 292 000 • Denmark 82 000 • Total 2 368 000 m3

More Related