An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project OspreyRC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope • Advisor • Dr. Ward • Industry Representative • Mr. Walt Harrison University of Portland School of Engineering

  2. Overview • Introduction • Scorecard • Additional Accomplishments • Plans • Issues/Concerns • Conclusions University of Portland School of Engineering

  3. Introduction • RC-VTOL: Remote Controlled Vertical Takeoff and Landing • Combines advantages of helicopters and airplanes • Complex control processing • RC: perspective changes University of Portland School of Engineering

  4. Scorecard • Completed Project Plan to version 1.0 • Successful Design Review • Theory of Operations to version 0.89 • Work underway, not yet ready for 0.90 University of Portland School of Engineering

  5. Additional Accomplishments • All hardware received and ready to use • Received beta software for Eagle Tree Seagull Wireless Telemetry System • Tested and working correctly • Software implementation begun University of Portland School of Engineering

  6. Plans • Theory of Operations to 0.90 • And TOp to 0.95 • And TOp to 1.0 University of Portland School of Engineering

  7. Milestones Exceeded TimetableMet Timetable Behind TimetableNot Complete University of Portland School of Engineering

  8. Concerns/Issues • Staying on schedule • Having time for difficult design challenges • Airframe problems • Testing procedure University of Portland School of Engineering

  9. Conclusions • RC-VTOL: software based flight system • Work proceeding on TOp 0.90 • Progress on Telemetry Transmitter • Mitigated all previous concerns • Questions? University of Portland School of Engineering