50 likes | 171 Views
Run2 pp repass at CCJ. Hideyuki Kobayashi RBRC. Run2 pp repass motivation. Single muon spin analysis Significant improvement of efficiency and resolution is expected since last pass. It has been proven by dimuon repass. DC Calibration improvement Kalman filter gives better resolution.
E N D
Run2 pp repass at CCJ Hideyuki Kobayashi RBRC Hideyuki Kobayashi at Spin PWG
Run2 pp repass motivation • Single muon spin analysis • Significant improvement of efficiency and resolution is expected since last pass. • It has been proven by dimuon repass. • DC Calibration improvement • Kalman filter gives better resolution Hideyuki Kobayashi at Spin PWG
File size PRDF 1.5GB/file DST 360 MB/file Runs 39000~40655 10458 files 1.5GB*10k=15TB 360MB*10k=3.6TB Process Time 10 h / file 10 h * 10k / 200 CPU = 520 h = 3 weeks CCJ resouces HPSS - 400TB tape media Disk space - 25 TB 328 CPUs 700 MHz x32 800 MHz x 96 1 GHz x96 1.4 GHz x72 2.0 GHz x32 Availability for run2pp repass 200 CPUs Disk space as needed Data size and Time estimate Hideyuki Kobayashi at Spin PWG
Plan • Test production • First test production data release – Apr 21 • Final test production data release – Apr 28 • Production • Production start – May 5 • Production end – May 31 • After run2pp repass… • Run3pp pass can be started if RCF is busy Hideyuki Kobayashi at Spin PWG
People • Data Production Manager – Jan Rak • Deputy DPM – Hideyuki Kobayashi • CCJ staff • Yasushi Watanabe, Akio Kiyomichi, Satoshi Yokkaichi, Takashi Ichihara, … • Data quality check - everybody • People who has declared interest for run2pp repass • Central Arm • Jiangyong Jia, Christine Aidala, …etc. • Muon Arm • Hideyuki Kobayashi, Yongil Kwon, David Brown, … etc. Hideyuki Kobayashi at Spin PWG