COMMISSIONING MEETING – MARCH 2008 - W2. PS/SPD HARDWARE STATUS. Work devoted to A-side (prior to the access): Wiener PS replacements and checks. Cooling system is operationnal for PS and SPD. SPD: VFE measurements. PS: VFE/FE connectics measured.
E N D
COMMISSIONING MEETING – MARCH 2008 - W2 PS/SPD HARDWARE STATUS • Work devoted to A-side (prior to the access): • Wiener PS replacements and checks. • Cooling system is operationnal for PS and SPD. • SPD: VFE measurements. • PS: VFE/FE connectics measured. • LEDs have still to be measured for A-side (Evgueni, Edu, Valentin et al.) PS/SPD COMMISSIONING
COMMISSIONING MEETING – MARCH 2008 - W2 PS/SPD GLOBAL COMMISSIONING • C-side DAQ project was restored, tuned and eventually works. Safety copy is made. One single user on the PC. No crash. A dream… • Allowed to join the global comissioning activity already on Wednesday. • PS and SPD full C-side global-commissioned succesfully. • Search for cosmics. Seen in both detectors. • We re-enter on Friday in GC activity. TAE events (in the mode +/- 2 around bunch crossings) debugged. Found the L0pipeline latency. • Few kevents recorded. PS/SPD COMMISSIONING
COMMISSIONING MEETING – MARCH 2008 - W2 PS/SPD COMMISSIONING
COMMISSIONING MEETING – MARCH 2008 - W2 PS/SPD COMMISSIONING
COMMISSIONING MEETING – MARCH 2008 - W2 PS/SPD COMMISSIONING
COMMISSIONING MEETING – MARCH 2008 - W2 PS/SPD COMMISSIONING