1 / 12

„ E U R O B U S I N E S S PARC O R A D E A ” - INDUSTRIAL PAR K -

„ E U R O B U S I N E S S PARC O R A D E A ” - INDUSTRIAL PAR K -. Area of the park : 121 hectares Loca tion : Oradea, Borșului Road (E60) Owner of the land : Oradea city Administrator: SC EUROBUSINESS PARC ORADEA SRL Sole shareholder : Oradea city

jude
Download Presentation

„ E U R O B U S I N E S S PARC O R A D E A ” - INDUSTRIAL PAR K -

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. „ EUROBUSINESS PARC ORADEA” - INDUSTRIALPARK-

  2. Area of the park:121 hectares Location: Oradea, Borșului Road (E60) Owner of the land: Oradea city Administrator: SC EUROBUSINESS PARC ORADEA SRL Sole shareholder: Oradea city The title of industrial park:Order of MIRA no.685 /15th of December, 2008

  3. Activities: processing industry services (business, warehousing, logistic, others) Services and utilities in the park:interior roads, water and sewage supply, heating energy, electricity, natural gas, telecommunications Fiscal facilities: no property tax is due for buildings land within Industrial Park is exempted from the land taxation

  4. Location: Borșului Road, km 29 (E60/DN1) 4 km away from the border with Hungary 4 km away from the access point for the future Transilvania Highway 3 km from the entrance in Oradea 6.8 km from Oradea Airport 5.2 km from the city center (city hall) 2 km from the Oradea Railway Station Front side of the park to E60: 1,2 km

  5. Road access: E60 - Hungarian border - Oradea - Cluj-Napoca - Cluj-Napoca - TârguMureş - Sighişoara - Braşov - Sinaia - Ploieşti - Bucureşti - Slobozia – Constanţa E671-(Connection way between E60 and E70) Oradea - Arad – Timişoara E79 -Oradea - Deva - Simeria - Târgu Jiu - Craiova – Bulgarian border DN1 -Bucureşti - Ploieşti - Braşov - Făgăraş - Sibiu - Alba Iulia - Turda - Cluj Napoca - Oradea – Hungarian border DN19-Oradea - Satu Mare - Negreşti Oaş - Sighetu Marmaţiei DN76-Oradea - Beiuş - Deva (DN7) DN79-Oradea - Arad

  6. Neighbourhood: -International Transport Companies: Galassini, Centrum, Frigoexpres -Constructions companies: Selina SA, CIAC, SIMBAC SA -Company of producing IT components: Celestica, Connectronics -Heating and electrical power Supplier: Sc Electrocentrale SA -Custom house for goods -High Power Transformer Station -Water cleaning Station

  7. The offer for land in the industrial park • Concession • procedure: public tender • - starting price: 0,32 EUR/sqm/year – for the industry area • 0,38 EUR/sqm/year- for the services area • - administration tax: 0,50 EUR/sqm/year • The possibility to purchase the landafter realizing the investment (100%). • Price of the land: starting from 8 EUR/sqm

  8. The access of the investors in the Industrial Park • Qualification requests – constitutive documents of the company, certificates • Evaluation of the offers: • Score100 points • Offeredprice35 points • The investmentengaged 35 points • The number of jobs created30 points

  9. Mandatory clauses in the terms of reference • Time limits for realizing the investment: • submit the documents for obtaining the building permit: within 4 months from the date on which the contract came into force • starting the works: within maximum 1 year fromthe date on which the contract came into force • The carrying on of the activity for which the concession contract was concluded is necessary to be started within 2 months from finalization of the constructions. • Statutes of Eurobusiness Parc Oradea – Decision of the Local Council of Oradea no.25/2009

  10. Activitiesforseen for theyear 2009 • CompletingtheUrbanistic Zonal Plan : August 2009 • Completing Feasibility Study for infrastructure (roads and utilities) : August 2009 • Openingupthe public tender for theavailablelots: August 14th, 2009