Toothpick Bridge Project Management

Toothpick Bridge Project Management. Where you should be: Potential Designs Finalized Feasibility and Merit Criteria Finalized Next Steps: Feasibility Analysis and Merit Analysis ID one design for construction Build the selected design. W R I T E U P.

Download Presentation

Toothpick Bridge Project Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Toothpick BridgeProject Management • Where you should be: • Potential Designs Finalized • Feasibility and Merit Criteria Finalized • Next Steps: • Feasibility Analysis and Merit Analysis • ID one design for construction • Build the selected design W R I T E U P

  2. Toothpick BridgeProject Management • Toothpicks, glue, wax paper were distributed last week • The scale for weighing your bridge is in the engineering student computer lab (rm. 102) • Not available • Wednesday Feb. 11, 2:45 PM to 5:45 PM • Thursday Feb. 12, after 9:00

  3. Toothpick BridgeProject Management Destructive Testing (Bridge Failure Load) Tuesday, 9 Feb or Wednesday, 10 Feb (this is next week!)

  4. Toothpick BridgeProject Management Documents Due and Presentations Tuesday, 16 Feb or Wednesday, 17 Feb