50 likes | 165 Views
Toothpick Bridge Project Management. Where you should be: Potential Designs Finalized Feasibility and Merit Criteria Finalized Next Steps: Feasibility Analysis and Merit Analysis ID one design for construction Build the selected design. W R I T E U P.
E N D
Toothpick BridgeProject Management • Where you should be: • Potential Designs Finalized • Feasibility and Merit Criteria Finalized • Next Steps: • Feasibility Analysis and Merit Analysis • ID one design for construction • Build the selected design W R I T E U P
Toothpick BridgeProject Management • Toothpicks, glue, wax paper were distributed last week • The scale for weighing your bridge is in the engineering student computer lab (rm. 102) • Not available • Wednesday Feb. 11, 2:45 PM to 5:45 PM • Thursday Feb. 12, after 9:00
Toothpick BridgeProject Management Destructive Testing (Bridge Failure Load) Tuesday, 9 Feb or Wednesday, 10 Feb (this is next week!)
Toothpick BridgeProject Management Documents Due and Presentations Tuesday, 16 Feb or Wednesday, 17 Feb