National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power & Port Facilities. Share Holders & Financial Advisors March 2008. Spectrum of Operations. Bauxite Mine. Alumina Refinery. Spectrum of Operations. Aluminium Smelter. Thermal Power Plant.
E N D
National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power & Port Facilities Share Holders & Financial Advisors March 2008
Spectrum of Operations Bauxite Mine Alumina Refinery
Spectrum of Operations Aluminium Smelter Thermal Power Plant Port facility
PAST HIGHLIGHTS Rs. Crore SALES Exports CAGR 24% CAGR 15% Net Profit Rs. EPS CAGR 46% CAGR 46%
EXPANSION OF REFINERY • 5TH STREAM OF 7 LAKH MT IN REFINERY FROM YEAR 2012 (TOTAL CAPACITY – 30 LAKH MT) • INVESTMENT – Rs 1800 CRORE
BAUXITE NEED OF REFINERY LAKH MT
BAUXITE RESERVE LAKH MT REQUIREMENT TILL YEAR 2040 - 2853
5TH POTLINE OF 1.15 LAKH MT AT ANGUL INVESTMENT: Rs 1800 CRORE (SMELTER) Rs 500 CRORE – 1x 120 MW (POWER) EXPANSION OF SMELTER
REQUIREMENT LAND : 100 HECTARE POWER : 1.7 MU P.A. (120MW+SURPLUS ) COAL : 8.5 LAKH MT P.A. ALUMINA: 2.3 LAKH MT POSITION LAND : UNDER ACQUISITION BY GOVT COAL : ADDITIONAL LINKAGE OF 1O LAKH MT REQUIRED (UTKAL-E COAL BLOCK CAN CATER FOR 17 YEARS ONLY) 5TH POTLINE - ANGUL
SURPLUS ALUMINA – 18 LAKH MT SURPLUS ALUMINA + VALUE ADDITION NEEDS CAPTIVE POWER REFINERY or SMELTER- NEEDS BAUXITE / COAL BACKGROUND
SETTING UP 5 LAKH MT SMELTER IN TWO PHASES OF 2.5 LAKH MT EACH 7000MU POWER NEEDED - 1250 MW CAPACITY CAPTIVE POWER PLANT NEEDS 75 LAKH MT COAL OR 80 BILLION CUBIC FT GAS PER YEAR. GREENFIELD SMELTER
MINES + REFINERY + POWER + SMELTER REFINERY + POWER + SMELTER POWER + SMELTER INDIA (ORISSA)
SMELTER + POWER (Gas-based) SMELTER + POWER (Coal-based) SMELTER (Where power is purchased) ABROAD Contd..
INDONESIA: MoU signed with Govt. of South Sumatra. Consultant being engaged in Indonesia to prepare feasibility report. SAUDI ARABIA: Discussions on with potential local partner of Gulf for setting up Plants in Saudi Arabia in JV. ABROAD Contd..
SOUTH AFRICA: Matter being pursued with South African Govt for JV, with a local Group IRAN: Discussions on with a local Company of Iran for JV. ABROAD
FLY ASH UTILIZATION CAUSTIC SODA PROJECT WIND POWER PROJECT ALUMINIUM WAGON PROJECT CT PITCH PROJECT UP & DOWNSTREAM INTEGRATION
FLY ASH UTILIZATION: 12 EOI received to utilize fly ash and convert it into saleable products. Under evaluation. CAUSTIC SODA: 12EOI received for setting up a 50 to 120 K MT plant. Under evaluation. UP & DOWNSTREAM INTEGRATION
WIND POWER: Wind data being collected at Damanjodi. Target- 50 MW Farm by 2010. ALUMINIUM WAGON PROJECT: MOU being signed with BEML for prototype of Aluminium Rail Wagon. CT PITCH : Discussion with NINL is on for a JV project. UP & DOWNSTREAM INTEGRATION
ALUMINIUM INDUSTRIAL PARK Park at Angul is proposed to be developed through a Special Purpose Vehicle (SPV) comprising NALCO, IDCO, OSFC, OSIC and other private parties. UP & DOWNSTREAM INTEGRATION