1 / 6

IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005

IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005. By: Autumn Szabo, CEA Email: AXS7@NRC.GOV Phone: 301-415-6587. The NRC. Organization Mission Different from military applications Similar HF needs / research. NRC Activities. Study / validation (1990s) Staffing

kaden
Download Presentation

IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IMPRINT Developer’s Workshop:NRC’s PerspectiveDecember 6 -7, 2005 By: Autumn Szabo, CEA Email: AXS7@NRC.GOV Phone: 301-415-6587

  2. The NRC • Organization • Mission • Different from military applications • Similar HF needs / research

  3. NRC Activities • Study / validation (1990s) • Staffing • Alarm systems • Remote Afterloading Brachytherapy • Evaluation • Staffing (Development Complete) • Operator Workload (Current)

  4. Why the NRC uses Simulation • Simple • Comprehensive • Easy to Use • Faster than real time data collection • Enhances understanding of system • Supplements empirical research

  5. IMPRINT for NRC application • IMPRINT developed for: • Early design evaluation • Opportunity to affect design • Single system acquisition • Distributed / environmental extremes • NRC needs: • Post-construction evaluation • Opportunity to affect operations • Multiple variations of similar system evaluation • Fixed environment

  6. Possible Opportunities • Cooperative research • Possible uses for Imprint and other variants • Cost sharing • Development of future research regarding Imprint applications • Data sharing • Related applications for simulation • Any background information related to staffing or operator workload

More Related