Presentation on ON LINE TRANSFORMER OIL REGENERATION PROCESS OF GT-8

Presentation on ON LINE TRANSFORMER OIL REGENERATION PROCESS OF GT-8 GAS TURBINE POWER STATION, URAN. MAHARASHTRA STATE POWER GENERATION CO, LTD GAS TURBINE POWER STATION, URAN. UNIT NO-8 GENERATOR TRANSFORMER  ON LINE OIL REGENERATION WITH PURIFICATION, DECARBURIZING, DE- SLUDGING

kaida
Download Presentation

Presentation on ON LINE TRANSFORMER OIL REGENERATION PROCESS OF GT-8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation on ON LINE TRANSFORMER OIL REGENERATION PROCESS OF GT-8 GAS TURBINE POWER STATION, URAN

  2. MAHARASHTRA STATE POWER GENERATION CO, LTD GAS TURBINE POWER STATION, URAN. UNIT NO-8 GENERATOR TRANSFORMER  ON LINE OIL REGENERATION WITH PURIFICATION, DECARBURIZING, DE- SLUDGING NAME OF THE AGENCY: - M/S, CEE DEE VACUUM EQUIPMENT PVT LTD, PLOT NO-81- B/16, GENERAL BLOCK, MIDC, BHOSARI, PUNE-411026 TRANSFORMER DETAILS:- 146000 KVA,10.5/220 KV.  Qty of oil:- 35000 liters Oil REGENERATION STARTED: - 07/12/2009 Oil REGENERATION STOPPED: - 16/01/2010 TOTAL PROCESS DAYS: - 41 DAYS AVARAGE DAILY OIL PASSED:- 20 to 25000 LTR / DAY TOTAL OIL PASSED THROUGH REGENERATION PLANT : - 9,93,934 LTRS

  3. GT 8 GENEARATOR TRANSFORMER FOR REGENERATION PROCESS

  4. REGENERATION PLANT IN CONTAINER

  5. OIL SAMPLES DURING REGENERATION PROCESS

  6. CONTROL PANEL OF REGENERATION PLANT

  7. OIL SAMPLES DURING REGENERATION PROCESS

  8. OIL SAMPLES DURING REGENERATION PROCESS

  9. OIL AND WINDING TEMP DURING REGENERATION PROCESS

  10. SUCTION PIPE CONNECTION TO TRANSFORMER BOTTOM

  11. DISCHARGE PIPE CONNECTION TO CONSERVATOR TANK BOTTOM VIEW OF TANK

  12. MAHARASHTRA STATE POWER GENERATION CO, LTD GAS TURBINE POWER STATION, URAN. UNIT NO-8 GENERATOR TRANSFORMER  ON LINE OIL REGENERATION WITH PURIFICATION, DECARBURIZING, DE- SLUDGING NAME OF THE AGENCY: - M/S, CEE DEE VACUUM EQUIPMENT PVT LTD, PLOT NO-81- B/16, GENERAL BLOCK, MIDC, BHOSARI, PUNE-411026  ON LINE OIL REGENERATION WITH PURIFICATION, DECARBURIZING, DE- SLUDGING OILSAMPLE RESULTS COMPARATIVE STATEMENT & ANALYSIS AND TRANSFORMER TEST RESULTS