1 / 29

Kaizen Lean Assessment Audit

nstalling Fake Turf Coronado!If you live in Coronado and have never thought of installing fake turf in your yard, may be it is time you gave it a shot. This grass brings

Download Presentation

Kaizen Lean Assessment Audit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to Audit KAIZEN®/ Lean Assessment June 24-27, 2013, Abuja

  2. Agenda • Management Priorities • Highlights • Some Metrics • Way Forward • Potential Benefits • Q & A

  3. Top Management Direction: OE Imperatives for BE • Improve Customer Satisfaction: Room supplies; Food variety, quality & service • Upgrade facility and guest amenities for improved guest perception of VFM • Reduce procurement lead time & delivered item cost • Reduce % Operating Cost (Food, Energy, R&M) • Improve employee morale and engagement in continuous improvement

  4. Management Priorities & Challenges • Shareholder/ Management value • Reduced % Food cost • Reduced Repairs & maintenance bill • Lower overall operating cost • Reduced energy bills • Replacement of aged equipment & infrastructure Customer value • Improved customer experience, satisfaction • Reduced Room turnaround time /Smooth Guest check-in • Improved Room Service delivery -quality performance • Timely availability of Room supplies • Timely approval, procurement & product availability • Service delivery for short-notice events • Employee engagement (issues) • Improved safety & security • Ownership, flexibility, openness to new learning • Availability of buses • Team deployment and efficiency • “One voice” in THTSL • Other issues • Management of traffic flow and parking • Training & support for IT • Reduction in “left behinds” • Real time guest feedback

  5. Highlights: Some overall observations Strengths: • Clarity of Top Management OE vision and direction • Strong customer orientation and focus • Open, progressive management team • Excellent property, great potential Challenges & opportunities: • Lack of “modern” guest amenities (wi-fi, TV, phone ..) • Need for room/ hotel infrastructure upgrade • Employee morale needs urgent address

  6. Some Gemba Observations

  7. Stores Disorderly storage; difficult to retrieve material

  8. Kitchen and Laundry Cluttered Workspace; difficult to maintain FIFO (First-in First-out) in cold-store

  9. Operating Cost Break Up Operating Cost Break-Up Operating Cost Break-Up as a % of revenue

  10. Cost Break Up - Utilities Energy Cost Break-Up

  11. F&B Revenue Break Up Food Revenue Break-Up. 35% - Food cost as a % of revenue Beverage Revenue Break-Up. 19.5% - Beverage cost as a % of revenue

  12. Food and Beverage – Daily Covers High day-to-day variation in Lunch-Dinner covers (42 data points) Note: This trend needs to be viewed with Actual Lead Time for “short notice” banquets/ events (data recording needs to be initiated)

  13. Customer Complaints Source of customer complaints BTQ/Events customer complaints

  14. Customer Complaints Business centre complaints Housekeeping complaints Laundry complaints

  15. Guest Waiting/ Room Turnaround Time (Room TAT) Room TAT for Last guest check-out time  Next guest check-in time for a specific room 18 data points from front office Large variation observed

  16. Inventory and Consumption Analysis - Food 57%

  17. Inventory and Consumption Analysis – General Store

  18. Technical Services

  19. “Ageing Infrastructure” SURVEY OF AREAS & TECHNICAL INSTALLATIONS: ‘A’ ITEMS ARE THOSE THAT HAVE EXCEEDED THEIR EXPECTED LIFE BY HILTON / INDUSTRY STANDARDS • AREA ‘A’ PRIORITY ITEMS • SAFETY EQUIPMENT & SYSTEM 9 • SECURITY: CCTV – TV, MUSIC SYSTEM 20 • ELECTRICAL SYSTEM & EQUIPMENT • ROOF TOP 13 • EXECUTIVE FLOOR 7 • GUEST ROOMS / CORRODOR 9 • FRONT OF HOUSE (Health Centre) 1 • PUBLIC AREAS 8 • F&B OUTLETS 12 • BACK OF HOUSE 5 • LANDSCAPE & FAÇADE 9 Source: Study conducted by Chief Engineer

  20. Hotel: Critical Equipment (“Show Stoppers”) • GENERATORS • CHILLERS • STEAM BOILER / WATER CALORIFIER • MAIN WATER SUPPLY PUMP • FIRE PUMPS • WATER TREATMENT UNIT • FUEL SUPPLY PUMPS • BUSES • FUEL / GAS STORAGE TANKS • RELATED PIPING (etc) INSTALLATIONS

  21. Laundry, Kitchen: Critical Equipment • LAUNDRY • DRY CLEANING EQUIPMENT • WASHING MACHINES • FLAT BED DRYER • KITCHEN • (Data being listed by team)

  22. Buses: Maintenance Expense Jan-May 2013 and Forward Estimate

  23. Key Initiatives – Phase 1 • Implement 5S in Stores, Kitchen, Laundry, Utilities and Parking • Streamline flow of Purchasing & Procurement process • Reduce Room Turn-around Time • Improve Delivery-Quality of Short-notice Events • Initiate TPM through Autonomous Maintenance of critical equipment in Technical Service, Kitchen, Laundry • Reduce Energy Consumption • Reduce F&B Costs as a percentage of F&B Revenue • Reduce inventory of slow moving items

  24. Roadmap & Benefits

  25. TENTATIVE ROADMAP – PHASE 1 (1/3) • 18 Month engagement, consisting of: • Start-up Activities • Transformation Actions (Implementation in Gemba) • Actions to Sustain improvements START UP ACTIVITIES

  26. TENTATIVE ROADMAP – PHASE 1 (2/3) TRANSFORMATION ACTIONS

  27. TENTATIVE ROADMAP – PHASE 1 (3/3) ACTIONS TO SUSTAIN CONTINUOUS IMPROVEMENT

  28. Potential Benefits (First estimates)

More Related