A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia
Introduction According to the new trends in power system supervision, XMhas formulated a project to conceptualize, design and implement an Advanced Supervision and Control system in the Colombian power system based on the paradigms of WAMS and WAMPAC. The project proposes the radical evolution from the traditional Energy Management Systems being used today, towards the utilization of new technologies for measurement, analysis, computing and communications for control center operations. The planned solution will integrate “electrical” data with non-traditional asset monitoring data to implement a platform for complete system awareness.
The Electric Power Industry Today Supervision and control Limited Supervision Itis a 1970’s ArchitectureParadigm
Challenges for Fast Growing Economies • GDP and demand growth above 5% • Increased population densities around cities • “Deficient” urban planning • Increasing land costs • Tighter environmental laws • Sub-transmission and Distribution networks close to their capacity and their life cycle • How to serve cities hungry for energy with improved reliability? • How to serve them as economically as possible? • Which technologies will enable all this non converging goals?
Smart Sensors & Total Network Awareness • Operational Security & Optimization • Operations Planning • Substation Automation • Asset Management • Maintenance Optimization • Emergency Response IEC 61850
What do we have today? • Current WAMSImplementation: • 16 Substations with PMU monitoring • Psymetrix/Alstom PhasorPointPDC • OpenPDC as PDC for Research and Development • Next Steps: • Ongoing installations for additional 24 PMUs • Ongoing prototype development for IDDs at three substations for Collaborative Protection and State Reconciliation • Developing a Road Map with ISA (XM’s Parent Company and Transmission Owner) for including non operational variables for Dynamic Transmission Operation and Planning • International Collaboration: • Currently developing the formulation for technical assistance support from USTDA for the design of the Data Bus and Gateway functionality for the iSAAC project in association with Quanta Technology. Instaladas / en instalación Transelca 2012 (Solo V) ISA 2012 / 2013 (Solo V)
Loaded corridor risk assessmentUsing OpenPDC for data analysis
Final Remarks… The challenge for the new electric industry is to monitor, control and protect the energy infrastructure on a new market environment with more dynamic energy flows. With an improved reliability promise !
Thank You ! For further Information, please contact: RAMÓN A. LEÓN Senior Executive New Business Development XM S.A. E.S.P www.xm.com.co raleon@xm.com.co +57 (311) 635 1703